Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40248
Well Classification: OW Status: PR - 1/2/2026
Well Name/No:Klein #19M-402
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/2/2026
FacilityID:438987LocationID:438989
County:WELD #123Location:NWNE 19 5N64W 6
Field:WATTENBERG - #90750Elevation:4628 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:688FNL  2432 FELLat/Long: 40.389990 / -104.592080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389990 / -104.592080Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/15/2017
End Date: 3/3/2017
Reported: 4/12/2017
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/2/2026             Measured TD: 17440 ft.    Vertical TD: 6809 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/2/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/3/2018
Proposed Top PZ Location:Sec:19 Twp: 5N 64W Footage: 26 FNL  1826 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64W Footage: 105 FNL  2306 FEL
Proposed Depth/Form:17445 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1425 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1425 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17445 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 17445 ft.

Wellbore Completed
Completion Date:12/10/2016
Spud Date:11/22/2016Spud Date Is:ACTUAL
Measured TD:17440 ft.Measured PB depth:17419 ft.
True Vertical TD:6809 ft.True Vertical PB depth:6809 ft.
Top PZ Location:Sec:19 Twp: 5N 64WFootage: 29 FNL  1920 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64WFootage: 79 FNL  2966 FWL
Log Types:CBL, MWD, Cased hole neutron (DIL in 123-20129)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1462 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 1462 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17433 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2130, Top: 710 ft., Bottom: 17433 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3677 ft.
SUSSEX4264 ft.
SHANNON4953 ft.
SHARON SPRINGS6511 ft.
NIOBRARA6679 ft.
FORT HAYS7233 ft.
CODELL7345 ft.
CARLILE7533 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/2/2026                  Interval Top: 7555 ft.    Interval Bottom: 17371 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/18/2017Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7507-7848, 9726-9866, 13251-13372
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7555 ft.# Of Holes:2688
Interval Bottom:17371 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/2/2026                  Interval Top: 7367 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation CODELL
1st Production Date:3/8/2017Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7348-7507, 7848-9726, 9866-10123, 10442-13251, 13372-13656, 13666-17322
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7367 ft.# Of Holes:84
Interval Bottom:7533 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/2/2026                  Interval Top: 7273 ft.    Interval Bottom: 17371 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/8/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/15/2017Treatment End Date:3/3/2017
Treatment Summary:72 Stage Plug and Perf, Perf'd from 7273-17207, 1 Toe Sleeve from 17318-17322 Total Fluid: 253,766 bbls Gel Fluid: 171,215 bbls Slickwater Fluid: 80,309 bbls 15% HCl Acid: 2,242 bbls Total Proppant: 11,674,430 lbs Silica Proppant: 11,674,430 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):253766Max pressure during treatment (psi):5557
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:72
Total acid used in treatment (bbls):2242Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10043
Fresh water used in treatment (bbls):251524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11674430Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 612
BBLS_OIL 308
BTU_GAS 1351
CALC_BBLS_H2O 612
CALC_BBLS_OIL 308
CALC_GOR 1785
CALC_MCF_GAS 550
CASING_PRESS 2614
GRAVITY_OIL 50
MCF_GAS 550
TUBING_PRESS 1543
Perforation Data:
Interval Top:7273 ft.# Of Holes:2796
Interval Bottom:17371 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/2/2026                  Interval Top: 7273 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/8/2017Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7273-7348, 10123-10442, 13656-13666
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7273 ft.# Of Holes:24
Interval Bottom:7322 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)3681
Total Gas Produced (MCF)19048
GOR5174
GOR DeterminationBOE
Average BOE per Day19.157
Average MCFE per Day111.094

 Federal Financial Assurance  i 

 Tribal Well  i No