Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40247
Well Classification: OW Status: PR - 3/29/2017
Well Name/No:Klein #19N-312
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/29/2017
FacilityID:438986LocationID:438989
County:WELD #123Location:NWNE 19 5N64W 6
Field:WATTENBERG - #90750Elevation:4628 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:689FNL  2342 FELLat/Long: 40.389990 / -104.591760Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389990 / -104.591760Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/15/2017
End Date: 3/3/2017
Reported: 4/12/2017
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/29/2017             Measured TD: 17429 ft.    Vertical TD: 6750 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/29/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/3/2018
Proposed Top PZ Location:Sec:19 Twp: 5N 64W Footage: 764 FNL  2109 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64W Footage: 829 FNL  2305 FEL
Proposed Depth/Form:17329 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1425 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1425 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17329 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 17329 ft.

Wellbore Completed
Completion Date:10/5/2016
Spud Date:9/23/2016Spud Date Is:ACTUAL
Measured TD:17429 ft.Measured PB depth:17399 ft.
True Vertical TD:6750 ft.True Vertical PB depth:6752 ft.
Top PZ Location:Sec:19 Twp: 5N 64WFootage: 764 FNL  2109 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64WFootage: 829 FNL  2305 FEL
Log Types:CBL, MWD (DIL in 123-20129)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1450 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1450 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17423 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2501, Top: 0 ft., Bottom: 17423 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN3589 ft.
SUSSEX4383 ft.
SHANNON4986 ft.
SHARON SPRINGS6463 ft.
NIOBRARA6636 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/29/2017                 Interval Top: 7033 ft.    Interval Bottom: 17355 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/18/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/15/2017Treatment End Date:3/3/2017
Treatment Summary:74 Stage Plug and Perf, Perf'd from 7033-17235, 1 Toe Sleeve from 17352-17355 Total Fluid: 252,550 bbls Gel Fluid: 165,541 bbls Slickwater Fluid: 84,911 bbls 15% HCl Acid: 2,098 bbls Total Proppand: 13,121,460 lbs Silica Proppant: 13,121,460 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):252550Max pressure during treatment (psi):4956
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):2098Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16927
Fresh water used in treatment (bbls):250452Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13121460Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6880 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 594
BBLS_OIL 419
BTU_GAS 1351
CALC_BBLS_H2O 594
CALC_BBLS_OIL 419
CALC_GOR 3281
CALC_MCF_GAS 1375
CASING_PRESS 2798
GRAVITY_OIL 50
MCF_GAS 1375
TUBING_PRESS 2066
Perforation Data:
Interval Top:7033 ft.# Of Holes:2628
Interval Bottom:17355 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9119
Total Gas Produced (MCF)111963
GOR12277
GOR DeterminationBOE
Average BOE per Day77.830
Average MCFE per Day451.398

 Federal Financial Assurance  i 

 Tribal Well  i No