| 404317699 | Form 17 | 7/21/2025 | 8/14/2025 | PLUNGER LIFT | 4 | CONTINUOUS | GAS | 0 | NO FLOW | 409 | 394 | No | -- | -- | Remediation follow up test. 4 PSI gas blew down to 0 within five minutes. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 7/31/2024 | 8/6/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 312 | 314 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403527208 | Form 17 | 9/11/2023 | 9/12/2023 | PLUNGER LIFT | 1 | WHISPER | GAS AND VAPOR | 0 | NO FLOW | 333 | 333 | No | -- | -- | Abatement system follow up test. 1 PSI whisper vapor blew down to 0 PSI within first 6 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403311005 | Form 17 | 2/1/2023 | 2/2/2023 | PLUNGER LIFT | 164 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 370 | 370 | No | -- | -- | Abatement system follow up test. 164 PSI gas and fluid blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403149636 | Form 17 | 8/22/2022 | 8/29/2022 | PLUNGER LIFT | 54 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 347 | 350 | Yes | -- | -- | Annual Test, 54 PSI gas and liquid hydrocarbon blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/7/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 426 | 426 | No | None | None | |
| 402425097 | Form 17 | 2/27/2020 | 6/17/2020 | | 1 | WATER H20 | -- | 0 | NO FLOW | 587 | 590 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402087562 | Form 17 | 4/29/2019 | 6/25/2019 | FLOWING | 800 | GAS | -- | 0 | NO FLOW | 749 | 749 | No | -- | -- | Annual Test 800 PSI slight gas whisper blew down to 0 PSI within minutes no pressure or flow after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 401268469 | Form 17 | 3/30/2017 | 4/27/2017 | FLOWING | 960 | GAS | -- | 0 | NO FLOW | 2799 | 2791 | No | -- | -- | Post Production Test. Pressure at start of test was 60 PSI, slight gas flow blew down to zero within 20 minutes of the 30 minute test, no flow through the remainder of the test. |
| 401209650 | Form 17 | 1/13/2017 | 2/14/2017 | SHUT-IN | 600 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |
| 401209704 | Form 17 | 1/9/2017 | 2/14/2017 | SHUT-IN | 300 | WHISPER | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |