Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-40247Klein
19N-312
PDC ENERGY INC
69175
PR
3/29/2017
WATTENBERG
90750
WELD  123
NWNE 19 5N64W 6
438989
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1450 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404317699Form 177/21/20258/14/2025PLUNGER LIFT4CONTINUOUS GAS0 NO FLOW 409394No----Remediation follow up test. 4 PSI gas blew down to 0 within five minutes. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull7/31/20248/6/2024 0Down to Zero--0Down to Zero312314NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
403527208Form 179/11/20239/12/2023PLUNGER LIFT1WHISPER GAS AND VAPOR0 NO FLOW 333333No----Abatement system follow up test. 1 PSI whisper vapor blew down to 0 PSI within first 6 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403311005Form 172/1/20232/2/2023PLUNGER LIFT164DOWN TO 0 GAS AND LIQUID HYDROCARBON0 NO FLOW 370370No----Abatement system follow up test. 164 PSI gas and fluid blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403149636Form 178/22/20228/29/2022PLUNGER LIFT54CONTINUOUS GAS AND LIQUID HYDROCARBON0 NO FLOW 347350Yes----Annual Test, 54 PSI gas and liquid hydrocarbon blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull8/7/202111/1/2021 0No Flow--0No Flow426426NoNoneNone 
402425097Form 172/27/20206/17/2020 1WATER H20 --0 NO FLOW 587590No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402087562Form 174/29/20196/25/2019FLOWING800GAS --0 NO FLOW 749749No----Annual Test 800 PSI slight gas whisper blew down to 0 PSI within minutes no pressure or flow after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401268469Form 173/30/20174/27/2017FLOWING960GAS --0 NO FLOW 27992791No----Post Production Test. Pressure at start of test was 60 PSI, slight gas flow blew down to zero within 20 minutes of the 30 minute test, no flow through the remainder of the test.
401209650Form 171/13/20172/14/2017SHUT-IN600GAS --0 NO FLOW 00No---- 
401209704Form 171/9/20172/14/2017SHUT-IN300WHISPER --0 NO FLOW 00No----