Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39518
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:North Platte #O-K-24HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:437399LocationID:429060
County:WELD #123Location:SESW 24 5N63W 6
Field:WATTENBERG - #90750Elevation:4567 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:461FSL  1339 FWLLat/Long: 40.378677 / -104.388884Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.378677 / -104.388802Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/22/2014
End Date: 8/24/2014
Reported: 10/15/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 10246 ft.    Vertical TD: 6520 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/29/2016
Proposed Top PZ Location:Sec:24 Twp: 5N 63W Footage: 443 FSL  2501 FWL
Bottom Hole Location:Sec:24 Twp: 5N 63W Footage: 1425 FNL  2564 FWL
Proposed Depth/Form:11307 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6904 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6904 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6804 ft., Depth: 11243 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/9/2014
Spud Date:6/25/2014Spud Date Is:ACTUAL
Measured TD:10246 ft.Measured PB depth:10246 ft.
True Vertical TD:6520 ft.True Vertical PB depth:6520 ft.
Top PZ Location:Sec:24 Twp: 5N 63WFootage: 443 FSL  2501 FWL
Bottom Hole Location:Sec:24 Twp: 5N 63WFootage: 1425 FNL  2564 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-25827).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 466 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 326, Top: 0 ft., Bottom: 466 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6712 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 878, Top: 261 ft., Bottom: 6712 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6493 ft., Depth: 10071 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3379 ft.
SHARON SPRINGS6322 ft.NN
NIOBRARA6447 ft.NN
FORT HAYS6861 ft.
CODELL6982 ft.
CARLILE8300 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/17/2018                 Interval Top: 8301 ft.    Interval Bottom: 10246 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:7/17/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 8301'-10246'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8301 ft.# Of Holes:
Interval Bottom:10246 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/17/2018                 Interval Top: 6983 ft.    Interval Bottom: 8300 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:7/17/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 6983'-8300'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6983 ft.# Of Holes:
Interval Bottom:8300 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 10/1/2024                 Interval Top: 6867 ft.    Interval Bottom: 10246 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:10/15/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/22/2014Treatment End Date:8/24/2014
Treatment Summary:18-stage completion using sliding sleeves and casing packers; 66006 total bbls fluid pumped: 65982 bbls fresh water (Slickwater) and 24 bbls 15% HCl acid; 3458192 total lbs proppant (sand) pumped: 131803 lbs 40/70 Ottawa, 3088320 lbs 20/40 Ottawa, and 238069 lbs 20/40 Super.
Total fluid used in treatment (bbls):66006Max pressure during treatment (psi):6877
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15812
Fresh water used in treatment (bbls):65982Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3458192Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6801 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 34
BBLS_OIL 66
BTU_GAS 1340
CALC_BBLS_H2O 34
CALC_BBLS_OIL 66
CALC_GOR 985
CALC_MCF_GAS 65
CASING_PRESS 515
GRAVITY_OIL 44
MCF_GAS 65
TUBING_PRESS 219
Perforation Data:
Interval Top:6867 ft.# Of Holes:
Interval Bottom:10246 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/17/2018                 Interval Top: 6867 ft.    Interval Bottom: 6982 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:7/17/2018Treatment End Date:N/A
Treatment Summary:Producing Interval: 6867'-6982'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:6867 ft.# Of Holes:
Interval Bottom:6982 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1237
Total Gas Produced (MCF)5756
GOR4653
GOR DeterminationBOE
Average BOE per Day6.093
Average MCFE per Day35.314

 Federal Financial Assurance  i 

 Tribal Well  i No