Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39223
Well Classification: OW Status: PA - 7/24/2025
Well Name/No:Alles #22S-232
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/24/2025
FacilityID:436688LocationID:327103
County:WELD #123Location:NESE 22 5N65W 6
Field:WATTENBERG - #90750Elevation:4645 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2138FSL  566 FELLat/Long: 40.383370 / -104.641930Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.383370 / -104.641930Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/21/2014
End Date: 5/22/2014
Reported: 5/28/2014
Days to report: 6
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/24/2025             Measured TD: 11888 ft.    Vertical TD: 6790 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/24/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2016
Proposed Top PZ Location:Sec:23 Twp: 5N 65W Footage: 2287 FSL  211 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65W Footage: 2331 FSL  500 FEL
Proposed Depth/Form:11927 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7275 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7275 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6070 ft., Depth: 11927 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/9/2014
Spud Date:3/30/2014Spud Date Is:ACTUAL
Measured TD:11888 ft.Measured PB depth:11880 ft.
True Vertical TD:6790 ft.True Vertical PB depth:6790 ft.
Top PZ Location:Sec:23 Twp: 5N 65WFootage: 2287 FSL  211 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65WFootage: 2331 FSL  500 FEL
Log Types:CBL, MWD (DIL in 123-14163)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7275 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 0 ft., Bottom: 7275 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7063 ft., Depth: 11884 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3626 ft.
SUSSEX4227 ft.
SHARON SPRINGS6544 ft.
NIOBRARA6785 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 7/24/2025                 Interval Top: 7476 ft.    Interval Bottom: 11756 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/20/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/15/2014Treatment End Date:5/22/2014
Treatment Summary:20 Stage Sliding Sleeve Stages 1-2 Frac'd 5/15/2014, Stages 5-20 frac'd 5/21/2014-5/22/2014 Total Fluid: 63,384 bbls Gel Fluid: 49,737 bbls Slickwater fluid: 13,623 bbls 15% HCl Acid: 24 bbls Total Proppant: 3,855,140 lbs Silica Proppant: 3,855,140 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):63384Max pressure during treatment (psi):3924
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):1.08
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8595
Fresh water used in treatment (bbls):63360Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3855140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 53
BBLS_OIL 335
BTU_GAS 1293
CALC_BBLS_H2O 53
CALC_BBLS_OIL 335
CALC_GOR 3268
CALC_MCF_GAS 1095
CASING_PRESS 2126
GRAVITY_OIL 53
MCF_GAS 1095
TUBING_PRESS 1379
Perforation Data:
Interval Top:7476 ft.# Of Holes:80
Interval Bottom:11756 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/24/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
09/13/2028
Inactive ExceptionN 
Noticed InactiveYNoticed Date
02/08/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No