| 404254237 | Form 17 | 6/11/2025 | 6/24/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
| 404161814 | Form 17 | 4/2/2025 | 4/11/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 330 | 330 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 7/9/2024 | 7/15/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 319 | 319 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403310089 | Form 17 | 2/1/2023 | 2/2/2023 | SHUT-IN | 14 | DOWN TO 0 | GAS | 0 | NO FLOW | 519 | 519 | No | -- | -- | Abatement system follow up test. 14 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 5/25/2022 | 6/13/2022 | | 10 | Down to Zero | -- | 0 | Down to Zero | 510 | 510 | No | None | None | |
| Click for Specifics | Full | 9/5/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 892 | 892 | No | None | None | |
| 402425964 | Form 17 | 4/15/2020 | 6/18/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 917 | 917 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402091420 | Form 17 | 4/15/2019 | 6/28/2019 | SHUT-IN | 200 | GAS | -- | 5 | WHISPER | 1092 | 1092 | Yes | -- | -- | Annual Test 200 PSI, blew down to 5 PSI with continuous gas whisper for 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 401176721 | Form 17 | 12/22/2016 | 1/3/2017 | PLUNGER LIFT | 110 | GAS | -- | 0 | DOWN TO 0 | 493 | 505 | No | -- | -- | |