Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37296
Well Classification: OW Status: PR - 2/5/2025
Well Name/No:Anderson #34R-223
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/5/2025
FacilityID:432815LocationID:432817
County:WELD #123Location:NENE 34 7N66W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Planned Location:250FNL  1270 FELLat/Long: 40.538040 / -104.758820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.538050 / -104.758820Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/11/2014
End Date: 2/12/2014
Reported: 2/21/2014
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/5/2025             Measured TD: 11617 ft.    Vertical TD: 7182 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/5/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/9/2015
Proposed Top PZ Location:Sec:34 Twp: 7N 66W Footage: 822 FNL  1151 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66W Footage: 500 FSL  774 FEL
Proposed Depth/Form:11639 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7649 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7649 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6441 ft., Depth: 11639 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/19/2014
Spud Date:1/7/2014Spud Date Is:ACTUAL
Measured TD:11617 ft.Measured PB depth:11610 ft.
True Vertical TD:7182 ft.True Vertical PB depth:7182 ft.
Top PZ Location:Sec:34 Twp: 7N 66WFootage: 814 FNL  1098 FEL
Bottom Hole Location:Sec:34 Twp: 7N 66WFootage: 501 FSL  781 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 931 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 931 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7547 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 523 ft., Bottom: 7547 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7407 ft., Depth: 11614 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3791 ft.
SUSSEX4444 ft.
SHANNON4999 ft.
SHARON SPRINGS6795 ft.
NIOBRARA7132 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/5/2025                  Interval Top: 7695 ft.    Interval Bottom: 11527 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/4/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/11/2014Treatment End Date:2/12/2014
Treatment Summary:25 Stage Sliding Sleeve, Swell Packer set at 7,612' Total Fluid: 68,657 bbls Slickwater Fluid: 17,973 bbls Gel Fluid: 50,684 bbls Total Proppant: 3,666,581 lbs Silica Proppant: 3,666,581 lbs Method for determining flowback volume" measuring flowback tank volumes
Total fluid used in treatment (bbls):68657Max pressure during treatment (psi):7684
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.01
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9916
Fresh water used in treatment (bbls):68657Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3666581Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 92
BBLS_OIL 199
BTU_GAS 1316
CALC_BBLS_H2O 92
CALC_BBLS_OIL 199
CALC_GOR 1814
CALC_MCF_GAS 361
CASING_PRESS 1669
GRAVITY_OIL 44
MCF_GAS 361
TUBING_PRESS 655
Perforation Data:
Interval Top:7695 ft.# Of Holes:0
Interval Bottom:11527 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY05/26/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)227
Total Gas Produced (MCF)2
GOR8
GOR DeterminationBOE
Average BOE per Day0.610
Average MCFE per Day3.546

 Federal Financial Assurance  i 

 Tribal Well  i No