|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 3/1/2023 Measured TD: 12195 ft. Wellbore Data for Original Wellbore | Wellbore Classification: PR - 3/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 2/14/2015 | Proposed Top PZ Location: | Sec:21 Twp: 1N 67W | Footage: 671 FSL 1434 FWL | Bottom Hole Location: | Sec:21 Twp: 1N 67W | Footage: 486 FNL 1413 FWL | Proposed Depth/Form: | 12029 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8073 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 850, Top: 0 ft., Bottom: 8073 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7043 ft., Depth: 12230 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/17/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12195 ft. | Measured PB depth: | 12176 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:21 Twp: 1N 67W | Footage: 671 FSL 1434 FWL | Bottom Hole Location: | Sec:21 Twp: 1N 67W | Footage: 486 N 1413 W | Log Types: | CBL, GR, MUD | Log Types: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 945 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 353, Top: 0 ft., Bottom: 942 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8076 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 780, Top: 1631 ft., Bottom: 8076 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7097 ft., Depth: 12186 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 1270 ft., Depth: 1950 ft., Bottom: 1290 ft., Sacks: 160, Method: SQUEEZE | Additional Cement: | String Type: S.C. 1.1 , Top: 1454 ft., Depth: 1440 ft., Bottom: 1510 ft., Sacks: 120, Method: SQUEEZE | Additional Cement: | String Type: S.C. 1.2 , Top: 1880 ft., Depth: 1240 ft., Bottom: 2014 ft., Sacks: 120, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 7338 ft. | | | | NIOBRARA | 7382 ft. | | | | FORT HAYS | 7922 ft. | | | | CODELL | 8900 ft. | | | |
Formation NBFHC Formation Classification: OW Status: PR - 3/1/2023 Interval Top: 8101 ft. Interval Bottom: 12195 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 2/24/2014 | Choke Size: | 14.000 in. | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/26/2014 | Treatment End Date: | 1/27/2014 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 8101-12195.
10832 BBL CROSSLINK GEL, 2372 BBL LINEAR GEL, 67866 BBL SLICKWATER, 81071 BBL TOTAL FLUID.
400100# 30/50 OTTAWA/ST. PETERS, 1909860# 40/70 OTTAWA/ST. PETERS, 2309960# TOTAL SAND.
We entered the Ft Hays 7926-8103, 8386-8906, 10405-10546
Nio 8103-8386
Codell 8906-10405, 10546-12194
| Total fluid used in treatment (bbls): | 81071 | Max pressure during treatment (psi): | 6303 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 32 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.74 | Recycled water used in treatment (bbls): | 81071 | Total flowback volume recovered (bbls): | 6597 | Fresh water used in treatment (bbls): | 81071 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2309960 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/5/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 4 | BBLS_OIL | 41 | BTU_GAS | 1118 | CALC_BBLS_H2O | 4 | CALC_BBLS_OIL | 41 | CALC_GOR | 3951 | CALC_MCF_GAS | 162 | CASING_PRESS | 1250 | GRAVITY_OIL | 48 | MCF_GAS | 162 |
| Perforation Data: | Interval Top: | 8101 ft. | # Of Holes: | 0 | Interval Bottom: | 12195 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2209 |
Total Gas Produced (MCF) | 56487 |
GOR | 25571 |
GOR Determination | MCFE |
Average BOE per Day | 32.593 |
Average MCFE per Day | 189.061 |
Federal Financial Assurance | i | |
|
|