Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36215
Well Classification: OW Status: PR - 11/1/2020
Well Name/No:RUSSIAN FIDDLER #35N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2020
FacilityID:430619LocationID:430621
County:WELD #123Location:SWSW 19 2N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:318FSL  1243 FWLLat/Long: 40.117496 / -104.711404Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117505 / -104.711407Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2013
End Date: 8/19/2013
Reported: 10/2/2013
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2020             Measured TD: 12397 ft.    Vertical TD: 7257 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2014
Proposed Top PZ Location:Sec:19 Twp: 2N 65W Footage: 691 FSL  1038 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 100 FSL  1024 FWL
Proposed Depth/Form:12678 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7537 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7537 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6506 ft., Depth: 12678 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/17/2013
Spud Date:4/4/2013Spud Date Is:ACTUAL
Measured TD:12397 ft.Measured PB depth:12373 ft.
True Vertical TD:7257 ft.True Vertical PB depth:7258 ft.
Top PZ Location:Sec:19 Twp: 2N 65WFootage: 691 FSL  1038 FWL
Bottom Hole Location:Sec:18 Twp: 2N 65WFootage: 100 FSL  1024 FWL
Log Types:CBL; GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 438, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7676 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 60 ft., Bottom: 7676 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6696 ft., Depth: 12382 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7116 ft.
NIOBRARA7196 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2020                 Interval Top: 7748 ft.    Interval Bottom: 12397 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/25/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2013Treatment End Date:8/19/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7748-12397. 48 BBL ACID,10596 BBL CROSSLINK GEL,2924 BBL LINEAR GEL,69544 BBL SLICKWATER,83112 BBL TOTAL FLUID. 653585# 30/50 OTTAWA/ST. PETERS SAND,1179706# 40/70 OTTAWA/ST. PETERS SAND,1833291# TOTAL SAND.
Total fluid used in treatment (bbls):83112Max pressure during treatment (psi):7215
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):11596
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1833291Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7202 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 459
BTU_GAS 1295
CALC_BBLS_OIL 459
CALC_GOR 1645
CALC_MCF_GAS 755
CASING_PRESS 2514
GRAVITY_OIL 47
MCF_GAS 755
TUBING_PRESS 1957
Perforation Data:
Interval Top:7748 ft.# Of Holes:0
Interval Bottom:12397 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1112
Total Gas Produced (MCF)31536
GOR28359
GOR DeterminationMCFE
Average BOE per Day17.880
Average MCFE per Day103.716

 Federal Financial Assurance  i 

 Tribal Well  i No