Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36051
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:DOWDY #8-4-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:430094LocationID:430092
County:WELD #123Location:NESE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4861 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2457FSL  202 FELLat/Long: 40.152680 / -104.641220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.152696 / -104.641233Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/19/2012
End Date: 12/21/2012
Reported: 3/7/2013
Days to report: 76
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 7780 ft.    Vertical TD: 7771 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/29/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 2644 FSL  68 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 2644 FSL  59 FEL
Proposed Depth/Form:7744 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7744 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6693 ft., Bottom: 7744 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4731 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 90, Top: 4105 ft., Bottom: 4731 ft.

Wellbore Completed
Completion Date:10/20/2012
Spud Date:10/16/2012Spud Date Is:ACTUAL
Measured TD:7780 ft.Measured PB depth:7740 ft.
True Vertical TD:7771 ft.True Vertical PB depth:7731 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 2644 FSL  68 FEL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 2644 FSL  59 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 919 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 930 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7765 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 623, Top: 3120 ft., Bottom: 7780 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4311 ft.
NIOBRARA6854 ft.
CODELL7137 ft.
J SAND7589 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7592 ft.    Interval Bottom: 7633 ft.

 Completed Information for Formation J SAND
1st Production Date:1/28/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/19/2012Treatment End Date:12/19/2012
Treatment Summary:Frac'd the J Sand with 251,400# 20/40 sand with 131,628 gals SLF. 12-19-12
Total fluid used in treatment (bbls):3134Max pressure during treatment (psi):3817
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):3134Total flowback volume recovered (bbls):301
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):251400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7592 ft.# Of Holes:55
Interval Bottom:7633 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 7140 ft.    Interval Bottom: 7154 ft.

 Completed Information for Formation CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2012Treatment End Date:12/21/2012
Treatment Summary:Set CFP @ 7198'. 12-19-12 Frac'd the Codell with 249,520# 20/40 sand with 78,624 gals SLF. 12-21-12
Total fluid used in treatment (bbls):1872Max pressure during treatment (psi):5010
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):1872Total flowback volume recovered (bbls):301
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249520Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7140 ft.# Of Holes:42
Interval Bottom:7154 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/29/2013                 Interval Top: 6910 ft.    Interval Bottom: 7633 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/29/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7750'. 01-18-13 Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 01-20-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7561 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 71
BBLS_OIL 41
BTU_GAS 1248
CALC_BBLS_H2O 71
CALC_BBLS_OIL 41
CALC_GOR 16415
CALC_MCF_GAS 673
CASING_PRESS 1398
GRAVITY_OIL 53
MCF_GAS 673
TUBING_PRESS 686
Perforation Data:
Interval Top:6910 ft.# Of Holes:145
Interval Bottom:7633 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 6910 ft.    Interval Bottom: 7154 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6910 ft.# Of Holes:90
Interval Bottom:7154 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/15/2013                 Interval Top: 6910 ft.    Interval Bottom: 6922 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/28/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2012Treatment End Date:12/21/2012
Treatment Summary:Set CFP at 6922'. 12-21-12 Frac'd the Niobrara with 250,000# 20/40 sand with 87,822 gals SLF. 12-21-12
Total fluid used in treatment (bbls):2091Max pressure during treatment (psi):6456
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):2091Total flowback volume recovered (bbls):301
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6910 ft.# Of Holes:48
Interval Bottom:6922 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1575
Total Gas Produced (MCF)24239
GOR15389
GOR DeterminationMCFE
Average BOE per Day15.776
Average MCFE per Day91.522

 Federal Financial Assurance  i 

 Tribal Well  i No