| Engineer | Form: (02) 400308116 08/06/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with a cement bond log.
|
| Permit | Form: (02) 400308116 08/06/2012 | Operator must meet water well testing requirements per Rule 318A.
|