Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35563
Well Classification: OW Status: SI - 7/1/2020
Well Name/No:Thomsen USX #X07-30D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2020
FacilityID:428878LocationID:428867
County:WELD #123Location:SWSW 6 2N65W 6
Field:WATTENBERG - #90750Elevation:4978 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1074FSL  781 FWLLat/Long: 40.163170 / -104.713050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.163180 / -104.713070Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/27/2012
End Date: 7/27/2012
Reported: 8/10/2012
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2020             Measured TD: 8160 ft.    Vertical TD: 7982 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/9/2014
Proposed Top PZ Location:Sec:6 Twp: 2N 65W Footage: 64 FSL  84 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65W Footage: 66 FSL  84 FWL
Proposed Depth/Form:8140 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 328, Top: 0 ft., Bottom: 960 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8140 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 8140 ft.

Wellbore Completed
Completion Date:6/23/2012
Spud Date:6/19/2012Spud Date Is:ACTUAL
Measured TD:8160 ft.Measured PB depth:8102 ft.
True Vertical TD:7982 ft.True Vertical PB depth:7924 ft.
Top PZ Location:Sec:6 Twp: 2N 65WFootage: 64 FSL  84 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65WFootage: 66 FSL  84 FWL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1052 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 324, Top: 13 ft., Bottom: 1052 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.875 in., Size: 4.5 in., Top: 2472 ft., Depth: 8145 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 3090 ft., Bottom: 8145 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE688 ft.
PARKMAN4187 ft.
SUSSEX4790 ft.
SHANNON5586 ft.
NIOBRARA7249 ft.
CODELL7548 ft.
J SAND8003 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2017                 Interval Top: 8007 ft.    Interval Bottom: 8032 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2012Treatment End Date:7/26/2012
Treatment Summary:PUMPED 256315# Ottawa sand and 16022# SB Excel in 163031gals of Clearstar, Gelled Water, Slick Water, Fresh Water downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3882Max pressure during treatment (psi):3963
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):352
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):272337Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8007 ft.# Of Holes:120
Interval Bottom:8032 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7548 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2012Treatment End Date:7/27/2012
Treatment Summary:PUMPED 134075# Ottawa sand in 96681gals of Clearstar, Gelled Water, Slick Water, 15% HCL downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):2302Max pressure during treatment (psi):4829
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):352
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):134075Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7548 ft.# Of Holes:64
Interval Bottom:7564 ft.Hole Size:0.4 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/28/2012                 Interval Top: 7332 ft.    Interval Bottom: 8032 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/28/2012Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 19
BBLS_OIL 83
BTU_GAS 1225
CALC_BBLS_H2O 19
CALC_BBLS_OIL 83
CALC_GOR 2145
CALC_MCF_GAS 178
CASING_PRESS 1048
GRAVITY_OIL 50
MCF_GAS 178
Perforation Data:
Interval Top:7332 ft.# Of Holes:192
Interval Bottom:8032 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 7/1/2020                  Interval Top: 7332 ft.    Interval Bottom: 7564 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2013Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7332 ft.# Of Holes:112
Interval Bottom:7564 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7332 ft.    Interval Bottom: 7438 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2012Treatment End Date:7/27/2012
Treatment Summary:PUMPED 234437# Ottawa sand in 163744gals of Clearstar, Gelled Water, Slick Water, Fresh Water downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3899Max pressure during treatment (psi):5435
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):352
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):234437Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7332 ft.# Of Holes:48
Interval Bottom:7438 ft.Hole Size:0.72 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2020
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No