| Click for Specifics | Full | 5/13/2025 | 7/21/2025 | | 1 | Whisper | None | 0 | No Flow | 872 | 871 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 11/18/2024 | 12/10/2024 | | 0 | No Flow | None | -- | No Flow | 853 | 853 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 6/12/2023 | 7/17/2023 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 484 | 486 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/16/2022 | 4/18/2022 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 958 | 957 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 4/1/2021 | 5/17/2021 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 950 | 949 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 2/20/2020 | 6/8/2020 | | 1 | Down To Zero | | 0 | Down To Zero | 992 | 992 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| Click for Specifics | Full | 4/9/2019 | 12/10/2019 | | 5 | Gas | | 1 | Whisper (Very Low Flow) | 1077 | 1078 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400991001 | Form 17 | 7/8/2014 | 2/17/2016 | PLUNGER LIFT | 1 | GAS | -- | >0 | DOWN TO 0 | -- | -- | No | -- | -- | CASING INACCESSIBLE---SC produced no fluid during form 17 test. Well was HZ prepped with a frac valve stabbed on tubing. |