|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 1/26/2026 Measured TD: 7793 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 1/26/2026 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 4/26/2014 | | Proposed Depth/Form: | 7935 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7935 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 200 ft., Bottom: 7935 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/17/2012 | | Spud Date: | 8/12/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7793 ft. | Measured PB depth: | 7740 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | CBL
High Resolution Induction Compensated Density compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 650 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7935 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 893, Top: 2010 ft., Bottom: 7935 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3690 ft. | | | | | SUSSEX | 4168 ft. | | | | | SHANNON | 4719 ft. | | | | | NIOBRARA | 7123 ft. | | | | | FORT HAYS | 7416 ft. | | | | | CODELL | 7435 ft. | | | | | GREENHORN | 7478 ft. | | | |
Formation CODL Formation Classification: OW Status: TA - 1/26/2026 Interval Top: 7435 ft. Interval Bottom: 7453 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/1/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/23/2013 | Treatment End Date: | 10/23/2013 | | Treatment Summary: | Codell Slickwater Frac with a total of 210,043 Gal of water, 12,500 lbs of 40/70 white sand, and 163,600 lbs of 30/50 white sand | | Total fluid used in treatment (bbls): | 5001 | Max pressure during treatment (psi): | 5506 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 2.00 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1667 | | Fresh water used in treatment (bbls): | 5001 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 176100 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 58 | | BTU_GAS | 1269 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 103 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 47 | | MCF_GAS | 6 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 7435 ft. | # Of Holes: | 72 | | Interval Bottom: | 7453 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/12/2024 |
| Defined Inactive (TA) | Y | Last Production 07/19/2025 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|