| Permit | Form: (02) 400265799 04/11/2012 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (02) 400265799 04/25/2012 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|