|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/2/2025 Measured TD: 6737 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/2/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/1/2013 | | Bottom Hole Location: | Sec:17 Twp: 5N 62W | Footage: 2172 FSL 819 FEL | | Proposed Depth/Form: | 6900 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: NESE | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 470 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 242, Top: 0 ft., Bottom: 470 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6900 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6050 ft., Bottom: 6900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/16/2011 | | Spud Date: | 10/12/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 6737 ft. | Measured PB depth: | 6688 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Bottom Hole Location: | Sec:17 Twp: 5N 62W | Footage: 2172 FSL 819 FEL | | Log Types: | CBL, GR, CD, CN, Dl | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6702 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 1700 ft., Bottom: 6702 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3402 ft. | | | | | SUSSEX | 4115 ft. | | | | | NIOBRARA | 6294 ft. | | | | | FORT HAYS | 6521 ft. | | | | | CODELL | 6547 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 12/6/2019 Interval Top: 6548 ft. Interval Bottom: 6556 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6548 ft. | # Of Holes: | 32 | | Interval Bottom: | 6556 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/2/2025 Interval Top: 6298 ft. Interval Bottom: 6556 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2011 | | Treatment Summary: | CODELL PUMPED 32,508 GAL PAD FLUID. PUMPED 102,732 GAL PHASERFRAC W/245,900 LBS 20/40 SAND. ISDP 3063 PSI, ATP 3377 PSI, ATR 22.3 BPM. NIOBRARA PUMPED 19,530 PAD FLUID. PUMPED 116,592 GAL PHASER FRAC W/260,630 LBS. PSI, 30/50 SAND. ISDP 2776 PSI ATP 3465 PSI, ATR 50.2 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 65 | | BTU_GAS | 1283 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 400 | | CALC_MCF_GAS | 26 | | CASING_PRESS | 790 | | GRAVITY_OIL | 40 | | MCF_GAS | 26 |
| | Perforation Data: | | Interval Top: | 6298 ft. | # Of Holes: | 80 | | Interval Bottom: | 6556 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/6/2019 Interval Top: 6298 ft. Interval Bottom: 6448 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6298 ft. | # Of Holes: | 48 | | Interval Bottom: | 6448 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/02/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|