|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/9/2024 Measured TD: 7478 ft. Vertical TD: 7308 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/9/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/28/2013 | | Proposed Top PZ Location: | Sec:29 Twp: 6N 65W | Footage: 1368 FSL 1336 FWL | | Bottom Hole Location: | Sec:29 Twp: 6N 65W | Footage: 1369 FSL 1344 FWL | | Proposed Depth/Form: | 7437 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 560 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 560 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7437 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7437 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/11/2011 | | Spud Date: | 8/6/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7478 ft. | Measured PB depth: | 7446 ft. | | True Vertical TD: | 7308 ft. | True Vertical PB depth: | 7273 ft. | | Top PZ Location: | Sec:29 Twp: 6N 65W | Footage: 1368 FSL 1336 FWL | | Bottom Hole Location: | Sec:29 Twp: 6N 65W | Footage: 1369 FSL 1344 FWL | | Log Types: | FDC/CNL, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 598 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 598 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7463 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 735, Top: 1990 ft., Bottom: 7463 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6957 ft. | 7260 ft. | | | | FORT HAYS | 7262 ft. | 7283 ft. | | | | CODELL | 7283 ft. | 7302 ft. | | |
Formation CODL Formation Classification: OW Status: CM - 1/17/2024 Interval Top: 7284 ft. Interval Bottom: 7295 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/9/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2011 | | Treatment Summary: | FRAC'D CODELL WITH 3682 BBLS VISTAR 22 GEL AND 250,860# 20/40 SAND. ATP 3916 PSI. ATR 25.2 BPM. ISDP 3807 PSI. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 69 | | BTU_GAS | 1 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 3420 | | CALC_MCF_GAS | 236 | | CASING_PRESS | 500 | | GRAVITY_OIL | 51 | | MCF_GAS | 236 |
| | Perforation Data: | | Interval Top: | 7284 ft. | # Of Holes: | 40 | | Interval Bottom: | 7295 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/9/2024 Interval Top: 6978 ft. Interval Bottom: 7295 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/25/2015 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 65 | | BTU_GAS | 1200 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 585 | | CALC_MCF_GAS | 38 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 52 | | MCF_GAS | 38 | | TUBING_PRESS | 1500 |
| | Perforation Data: | | Interval Top: | 6978 ft. | # Of Holes: | 260 | | Interval Bottom: | 7295 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/17/2024 Interval Top: 6978 ft. Interval Bottom: 7194 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/5/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/10/2014 | Treatment End Date: | 4/22/2014 | | Treatment Summary: | Frac Nio C w/ 4140 bbls FR water & 108,400 lbs 30/50 sand; frac Nio B w/ 6585 bbls FR water & 180,000 lbs 30/50 sand & frac Nio A w/ 3697 bbls FR water & 100,000 lbs 30/50 sand | | Total fluid used in treatment (bbls): | 14494 | Max pressure during treatment (psi): | 5639 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 3 | | Total acid used in treatment (bbls): | 72 | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1464 | | Fresh water used in treatment (bbls): | 14422 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 388400 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 13 | | BTU_GAS | 1309 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 462 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 1190 | | GRAVITY_OIL | 35 | | MCF_GAS | 6 |
| | Perforation Data: | | Interval Top: | 6978 ft. | # Of Holes: | 220 | | Interval Bottom: | 7194 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/09/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|