|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 8235 ft. Vertical TD: 7859 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/17/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 2560 FNL 1370 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 2560 FNL 1370 FWL | | Proposed Depth/Form: | 8225 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8225 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8225 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/11/2011 | | Spud Date: | 6/7/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8235 ft. | Measured PB depth: | 8207 ft. | | True Vertical TD: | 7859 ft. | True Vertical PB depth: | 7831 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 2559 FNL 1368 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 2551 FNL 1380 FWL | | Log Types: | PRE FORM 5 | | Log Types: | SD-DSN; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 841 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 841 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8228 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 233, Top: 6582 ft., Bottom: 8228 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1020 ft., Depth: 5789 ft., Bottom: 5789 ft., Sacks: 708, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 1014 ft., Depth: 5780 ft., Bottom: 5826 ft., Sacks: 708, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4205 ft. | 4498 ft. | | | | SUSSEX | 4674 ft. | 4920 ft. | | | | NIOBRARA | 7350 ft. | | | | | FORT HAYS | 7606 ft. | | | | | CODELL | 7628 ft. | | | | | J SAND | 8077 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 8080 ft. Interval Bottom: 8110 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/10/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/15/2011 | | Treatment Summary: | J S PERF 8080-8110 HOLES 62 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 148,688 gal Slickwater w/ 143,720# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8080 ft. | # Of Holes: | 62 | | Interval Bottom: | 8110 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 8/10/2011 Interval Top: 7398 ft. Interval Bottom: 8110 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/10/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/15/2011 | | Treatment Summary: | NB PERF 7398-7546 HOLES 68 SIZE 0.42
CD PERF 7630-7644 HOLES 56 SIZE 0.42
J S PERF 8080-8110 HOLES 62 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/10/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 12 | | BTU_GAS | 1208 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 3167 | | CALC_MCF_GAS | 38 | | CASING_PRESS | 1528 | | GRAVITY_OIL | 52 | | MCF_GAS | 38 |
| | Perforation Data: | | Interval Top: | 7398 ft. | # Of Holes: | 186 | | Interval Bottom: | 8110 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 5/1/2020 Interval Top: 7398 ft. Interval Bottom: 7644 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2011 | | Treatment Summary: | NB PERF 7398-7546 HOLES 68 SIZE 0.42 CD PERF 7630-7644 HOLES 56 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 249,992 gal Slickwater w/ 200,600# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 200,676 gal Slickwater w/ 150,700# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7398 ft. | # Of Holes: | 124 | | Interval Bottom: | 7644 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2021 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|