|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/22/2024 Measured TD: 7388 ft. Vertical TD: 7262 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/22/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/11/2012 | | Proposed Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 1210 FNL 1222 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 1211 FNL 1218 FEL | | Proposed Depth/Form: | 7353 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 525 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 226, Top: 0 ft., Bottom: 525 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7353 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 673, Top: , Bottom: 7353 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2012 | | Spud Date: | 2/16/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7388 ft. | Measured PB depth: | 7333 ft. | | True Vertical TD: | 7262 ft. | True Vertical PB depth: | 7207 ft. | | Top PZ Location: | Sec:32 Twp: 5N 65W | Footage: 1210 FNL 1222 FEL | | Bottom Hole Location: | Sec:32 Twp: 5N 65W | Footage: 1211 FNL 1218 FEL | | Log Types: | CBL/GRL/CCL, CDL/CNL/ML, HRIL. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 595 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 329, Top: 0 ft., Bottom: 595 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 1840 ft., Depth: 7378 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 1696 ft., Bottom: 7378 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4246 ft. | | | | | SHANNON | 4761 ft. | | | | | NIOBRARA | 6852 ft. | | | | | FORT HAYS | 7171 ft. | | | | | CODELL | 7193 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 11/9/2012 Interval Top: 7195 ft. Interval Bottom: 7210 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/23/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/18/2012 | | Treatment Summary: | Frac'd the Codell w/ 116054 gals of Silverstim and Slick Water 15% HCl with 236,765#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7195 ft. | # Of Holes: | 60 | | Interval Bottom: | 7210 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/10/2023 Interval Top: 6884 ft. Interval Bottom: 7210 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/18/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 29 | | BTU_GAS | 1227 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 12620 | | CALC_MCF_GAS | 366 | | CASING_PRESS | 430 | | GRAVITY_OIL | 60 | | MCF_GAS | 366 |
| | Perforation Data: | | Interval Top: | 6884 ft. | # Of Holes: | 108 | | Interval Bottom: | 7210 ft. | Hole Size: | 0.71 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/9/2012 Interval Top: 6884 ft. Interval Bottom: 7026 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/18/2012 | | Treatment Summary: | Frac'd the Niobrara w/ 153678 gals of Silverstim and slick water with 246,172#'s of Ottawa sand.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6884 ft. | # Of Holes: | 48 | | Interval Bottom: | 7026 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/22/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/12/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|