Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30624
Well Classification: GW Status: PA - 8/12/2021
Well Name/No:GLOVER V #12-18D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/12/2021
FacilityID:413261LocationID:329579
County:WELD #123Location:NWNE 12 2N67W 6
Field:WATTENBERG - #90750Elevation:4836 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:616FNL  1822 FELLat/Long: 40.157790 / -104.836220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.157799 / -104.836222Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/11/2021             Measured TD: 7621 ft.    Vertical TD: 7497 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/11/2021
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:9/27/2011
Proposed Top PZ Location:Sec:12 Twp: 2N 67W Footage: 1269 FNL  2558 FEL
Bottom Hole Location:Sec:12 Twp: 2N 67W Footage: 1270 FNL  2558 FEL
Proposed Depth/Form:7535 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 730 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 305, Top: 0 ft., Bottom: 730 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7535 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 614, Top: , Bottom: 7535 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:10/11/2009Spud Date Is:ACTUAL
Measured TD:7621 ft.Measured PB depth:7579 ft.
True Vertical TD:7497 ft.True Vertical PB depth:7455 ft.
Top PZ Location:Sec:12 Twp: 2N 67WFootage: 1269 FNL  2558 FEL
Bottom Hole Location:Sec:12 Twp: 2N 67WFootage: 1270 FNL  2558 FEL
Log Types:CBL/GR/CCL, CDL/CNL/ML, DIL/GR
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 802 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 363, Top: 0 ft., Bottom: 802 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7618 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 713, Top: 1230 ft., Bottom: 7618 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1192 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 464 ft., Bottom: 1192 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2813 ft.
PARKMAN3948 ft.
SUSSEX4488 ft.
SHANNON4980 ft.
NIOBRARA7204 ft.
FORT HAYS7446 ft.
CODELL7467 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/7/2010                 Interval Top: 7469 ft.    Interval Bottom: 7486 ft.

 Completed Information for Formation CODELL
1st Production Date:11/27/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/24/2009
Treatment Summary:FRAC'D CODELL W/ 134,988 GALS SLICK WATER, PHASERFRAC AND 15% HCI WITH 249,800#'S OF OTTAWA SAND. CODELL PRODUCING THROUGH FLOW PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7469 ft.# Of Holes:68
Interval Bottom:7486 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/12/2021                 Interval Top: 7326 ft.    Interval Bottom: 7486 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/27/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/24/2009
Treatment Summary:CODELL AND NIOBRARA ARE COMMINGLED
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 62
BTU_GAS 1299
CALC_BBLS_H2O 11
CALC_BBLS_OIL 62
CALC_GOR 3339
CALC_MCF_GAS 207
CASING_PRESS 890
GRAVITY_OIL 48
MCF_GAS 207
Perforation Data:
Interval Top:7326 ft.# Of Holes:92
Interval Bottom:7486 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/7/2010                 Interval Top: 7326 ft.    Interval Bottom: 7338 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/27/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/24/2009
Treatment Summary:FRAC'D NIOBRARA W/175,014 GALS SLICK WATER AND PHASERFRAC WITH 250,080#'S OF OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7326 ft.# Of Holes:24
Interval Bottom:7338 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/12/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No