| 402672698 | Form 17 | 4/27/2021 | 4/27/2021 | | 171 | CONTINUOUS | GAS | 1 | WHISPER | 465 | 469 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| 402500458 | Form 17 | 9/29/2020 | 9/30/2020 | | 97 | CONTINUOUS | -- | 1 | WHISPER | 552 | 557 | No | -- | -- | Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/9/2019 | 12/20/2019 | | 165 | Gas | -- | 1 | Gas | 589 | 588 | No | No | No | Tubing shut in. Surface casing produced no liquids. |
| 400965196 | Form 17 | 12/16/2015 | 1/6/2016 | | 37 | GAS | -- | 1 | GAS | 1363 | 1366 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 30 MIN BLOWDOWN, WHISPER. 15 MIN BUILD UP, 3. INITIAL POST REMEDIATION BLOWDOWN ON 12-9-15 STARTED WITH 121 PSI AND BLEW DOWN TO A WHISPER. |