|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 7605 ft. Vertical TD: 7294 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084208 | Expiration Date: | 9/3/2009 | | Proposed Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 123 FNL 53 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 123 FNL 53 FWL | | Proposed Depth/Form: | 7667 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 10/20/2008 | | Spud Date: | 10/15/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7605 ft. | Measured PB depth: | 7574 ft. | | True Vertical TD: | 7294 ft. | True Vertical PB depth: | 7263 ft. | | Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 123 FNL 53 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 123 FNL 53 FWL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 810 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 810 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7592 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 2050 ft., Bottom: 7592 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3766 ft. | | N | N | | SUSSEX | 4500 ft. | 4698 ft. | N | N | | NIOBRARA | 7120 ft. | | N | N | | FORT HAYS | 7416 ft. | | N | N | | CODELL | 7437 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 3/16/2009 Interval Top: 7440 ft. Interval Bottom: 7454 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/31/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/19/2008 | | Treatment Summary: | 174,228 GALS FLUID & 97,580 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7440 ft. | # Of Holes: | 56 | | Interval Bottom: | 7454 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 7126 ft. Interval Bottom: 7454 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/31/2008 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/20/2008 | | Treatment Summary: | COMMINGLE NIO/COD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7528 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/16/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1251 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 9590 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 1440 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 1040 |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | 176 | | Interval Bottom: | 7454 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/16/2009 Interval Top: 7126 ft. Interval Bottom: 7346 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/31/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/20/2008 | | Treatment Summary: | 1000 GALS ACID & 378,814 GALS FLUID & 294,040 LBS 30/50 SAND &8,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | 120 | | Interval Bottom: | 7346 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 153 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.411 |
| Average MCFE per Day | 2.384 |
| Federal Financial Assurance | i | |
|
|