| 404309439 | Form 17 | 7/30/2025 | 8/7/2025 | SHUT-IN | 73 | DOWN TO 0 | GAS | 0 | SURGE | 0 | 0 | No | -- | -- | Engineering Ad Hoc test. 73 PSI gas and water blew down to 4 PSI in thirty minutes. Gas and water observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| 404233598 | Form 17 | 6/3/2025 | 6/9/2025 | SHUT-IN | 51 | CONTINUOUS | GAS | 1 | WHISPER | 1060 | 1060 | No | -- | -- | Annual Test. 51 PSI continuous gas blew down to 1 PSI within thirty minutes of test. Gas turned to gas and liquid hydrocarbons at 7 minutes into test and continued for entire test, ~3 gals of fluid collected. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/17/2025 | 1/28/2025 | | 25 | Down to Zero | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 25 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 404020431 | Form 17 | 11/27/2024 | 12/9/2024 | SHUT-IN | 33 | CONTINUOUS | LIQUID HYDROCARBON | 0 | CONTINUOUS | 920 | 920 | No | -- | -- | Remediation follow up test. 33 PSI flow blew down to 0 PSI within thirty minutes, continuous liquid hydrocarbons observed throughout entire test . PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403703839 | Form 17 | 2/23/2024 | 2/29/2024 | PLUNGER LIFT | 25 | DOWN TO 0 | GAS | 40 | CONTINUOUS | 570 | 572 | No | -- | -- | Annual test. 25 PSI continuous water and gas flow increased to 40 PSI in 30 minutes, ~15 gallons fluid. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403298142 | Form 17 | 1/20/2023 | 1/23/2023 | PLUNGER LIFT | 52 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 5 | CONTINUOUS | 698 | 697 | Yes | -- | -- | Automation Alert follow-up test. 52 PSI gas and liquid hydrocarbon flow blew down to 0 PSI within first few seconds of test through 1/2" needle valve. At 20 minutes, gurgled and surges of same fluids. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/14/2022 | 2/21/2022 | | 29 | Down to Zero | -- | 0 | No Flow | 656 | 658 | No | No | No | |
| Click for Specifics | Full | 5/19/2021 | 12/21/2021 | | 29 | Water H2O | None | 3 | Whisper (very low flow) | 603 | 606 | No | None | None | |
| Click for Specifics | Light | 11/1/2020 | 12/14/2020 | | 0 | | -- | 0 | | 480 | 480 | No | No | No | |
| Click for Specifics | Light | 6/10/2019 | 11/27/2019 | | 10 | | | 0 | No Flow | 626 | 626 | No | No | No | |
| 400379997 | Form 17 | 1/30/2013 | 2/11/2013 | PLUNGER LIFT | 55 | GAS | -- | <1 | GAS | 306 | 315 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |
| 400286004 | Form 17 | 3/14/2012 | 5/17/2012 | PLUNGER LIFT | 66 | GAS | -- | <1 | WHISPER | 279 | 395 | No | -- | -- | surface casing produced no fluid |