|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2025 Measured TD: 8125 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2025 | | Wellbore Permit | | | Permit #: | 20063965 | Expiration Date: | 9/21/2007 | | Proposed Depth/Form: | 8116 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 4300 ft., Bottom: 5400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/24/2007 | | Spud Date: | 3/16/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8125 ft. | Measured PB depth: | 8017 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMPENSATED DENISTY/COMP.NEU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 607 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 607 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8115 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 6560 ft., Bottom: 8115 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5488 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 3920 ft., Bottom: 5488 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4523 ft. | | N | N | | SHANNON | 4974 ft. | | N | N | | NIOBRARA | 7254 ft. | | N | N | | CODELL | 7518 ft. | | N | N | | J SAND | 7948 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 11/1/2025 Interval Top: 7948 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2011 | | Treatment Summary: | CIBP SET AT 7570’ ON 10/30/2011. CFP SET @ 7345’ ON 10/30/2011 AND DRILLED OUT 11/7/11. THE J-SAND IS TA TO TEST THE CD-NB. | | Formation Treatment | | Treatment Date: | 3/30/2007 | | Treatment Summary: | J SAND COMPLETION FRAC'D THE J SAND WITH 173,040 OF FRAC FLUID AND 238,200# SAND 3/30/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | 88 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/15/2007 Interval Top: 7302 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2007 | | Treatment Summary: | JNBCD COMMINGLE DRILLED OUT CFP @ 7640' AND 7420' TO COMMINGLE THE JNBCD ON 4/11/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/15/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 140 | | BBLS_OIL | 50 | | BTU_GAS | 1135 | | CALC_BBLS_H2O | 140 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 9160 | | CALC_MCF_GAS | 458 | | CASING_PRESS | 537 | | MCF_GAS | 458 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 208 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.73 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 11/1/2025 Interval Top: 7302 ft. Interval Bottom: 7538 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/30/2011 | | Treatment Summary: | NIOBRARA - FRAC'D 7302-7322 W/140,655 GAL FRAC FLUID AND 138,000 # SAND.
CODELL - FRAC'D 7518-7538 W/143,250 GAL FRAC FLUID AND 215,100 # SAND.
CIBP SET @ 7570 ON 10/30/2011. CBP SET @ 7345 ON 10/30/201 AND DRILLED OUT 11/7/2011 | | Formation Treatment | | Treatment Date: | 3/30/2007 | | Treatment Summary: | SET CFP @ 7640' 3/30/07 FRAC'D THE CODL W/116,719 GAL FRAC FLUID AND 226,847# 20/40 SD SET CFT @ 7420' 4/3/07 FRAC'D THE NBRR 171,318 GAL FRAC FLUID AND 212,708# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 5 | | BTU_GAS | 1256 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 60 | | CALC_GOR | 7000 | | CALC_MCF_GAS | 420 | | CASING_PRESS | 150 | | GRAVITY_OIL | 52 | | MCF_GAS | 35 | | TUBING_PRESS | 616 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 120 | | Interval Bottom: | 7538 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 94 |
| Total Gas Produced (MCF) | 1628 |
| GOR | 17319 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.212 |
| Average MCFE per Day | 7.025 |
| Federal Financial Assurance | i | |
|
|