|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/12/2023 Measured TD: 7440 ft. Vertical TD: 7352 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/12/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20082621 | Expiration Date: | 8/4/2009 | | Proposed Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2807 FNL 53 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2807 FNL 53 FEL | | Proposed Depth/Form: | 7479 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: SWNW | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SENE |
| | |
| Wellbore Completed | | Completion Date: | 2/1/2009 | | Spud Date: | 1/24/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7440 ft. | Measured PB depth: | 7367 ft. | | True Vertical TD: | 7352 ft. | True Vertical PB depth: | 7279 ft. | | Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2807 FNL 53 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2807 FNL 53 FEL | | Log Types: | DIL, CDL, CNL, GR, SP, CAL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 427 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 427 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7440 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 525, Top: 3170 ft., Bottom: 7440 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1288 ft. | | N | N | | PARKMAN | 3688 ft. | | N | N | | SUSSEX | 4354 ft. | | N | N | | SHANNON | 4821 ft. | | N | N | | NIOBRARA | 6951 ft. | | N | N | | FORT HAYS | 7256 ft. | | N | N | | CODELL | 7279 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7280 ft. Interval Bottom: 7290 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/19/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2009 | | Treatment Summary: | FRAC'D WITH 143,152 GAL 26# SILVERSTIM HYBRID CROSS-LINKED GEL CONTAINING 270,580# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 40 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/12/2023 Interval Top: 6967 ft. Interval Bottom: 7290 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/16/2009 | Choke Size: | 0.438 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2009 | | Treatment Summary: | SEE INDIVIDUAL FORMATIONS BELOW |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 22 | | BTU_GAS | 1206 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 21955 | | CALC_MCF_GAS | 483 | | CASING_PRESS | 840 | | GRAVITY_OIL | 59 | | MCF_GAS | 483 |
| | Perforation Data: | | Interval Top: | 6967 ft. | # Of Holes: | 88 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 6967 ft. Interval Bottom: 7094 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/19/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2009 | | Treatment Summary: | FRAC'D WITH 69384 GAL SLICKWATER AND 105,588 GAL 20#-18# SILVERSTIM HYBRID X-LINKED GEL CONTAINING 238,480# 20/40 SAND AND 12,000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6967 ft. | # Of Holes: | 48 | | Interval Bottom: | 7094 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/12/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|