Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-27188CAMENISCH-SUPREME CAMP
8-4B
PDC ENERGY INC
69175
PA
4/12/2023
WATTENBERG
90750
EVANS/WELD  123
SENE 4 4N66W 6
310887
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 427 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403284436Form 171/9/20231/10/2023SHUT-IN52CONTINUOUS WATER AND GAS15 CONTINUOUS 10501050Yes----Pre-P&A. 52 PSI continuous gas and water flow blew down to 15 PSI within thirty minutes through 1/2" needle valve. PDC will schedule a sampling event and submit results via form 43.
403138137Form 178/16/20228/16/2022SHUT-IN46CONTINUOUS WATER AND GAS0 NO FLOW 00Yes----Annual Test, 46 PSI water and gas flow blew down to 0 PSI after 15 minutes of the test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. For wellbore diagram, see doc# 402924936
402924933Form 171/12/20221/13/2022SHUT-IN105CONTINUOUS VAPOR0 WHISPER 990990Yes----Abatement system follow up test, 105 PSI continuous vapor whisper flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402744226Form 177/7/20217/12/2021 55CONTINUOUS GAS15 WHISPER 00Yes----Abatement system follow up test, 55 PSI continuous gas, blew down to 15 PSI at end of 30 minute test. PDC will submit a sample and submit the results to COGCC.
402440665Form 174/7/20218/13/2021SHUT-IN65CONTINUOUS GAS4 WHISPER 800800No----Post-production, 65 PSI gas flow blew down to 4 PSI in thirty minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
Click for SpecificsLight12/6/202012/14/2020 0 --0 00NoNoNo 
402518466Form 1710/18/20208/13/2021CLOCK/INTERMITTER225CONTINUOUS GAS125 CONTINUOUS 549611Yes----Annual Test 225 PSI with continuous gas flow, blew down to 125 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.