|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/15/2019 Measured TD: 8185 ft. Vertical TD: 8044 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/15/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090573 | Expiration Date: | 3/10/2010 | | Proposed Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 2014 FSL 638 FEL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 2014 FSL 638 FEL | | Proposed Depth/Form: | 8197 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S17N2 |
| | |
| Wellbore Completed | | Completion Date: | 5/13/2009 | | Spud Date: | 5/9/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8185 ft. | Measured PB depth: | 8137 ft. | | True Vertical TD: | 8044 ft. | True Vertical PB depth: | 7997 ft. | | Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 2014 FSL 638 FEL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 2014 FSL 638 FEL | | Log Types: | CDL-CNL-DIL-GR-ML, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 974 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 0 ft., Bottom: 974 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8174 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1040, Top: 1723 ft., Bottom: 8174 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 145, Top: 592 ft., Bottom: 1510 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 592 ft., Depth: 1500 ft., Bottom: 1510 ft., Sacks: 145, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4346 ft. | 4417 ft. | N | N | | SUSSEX | 4746 ft. | 5077 ft. | N | N | | SHANNON | 5360 ft. | 5430 ft. | N | N | | NIOBRARA | 7622 ft. | | N | N | | FORT HAYS | 7993 ft. | | N | N | | CODELL | 8013 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/20/2010 Interval Top: 8014 ft. Interval Bottom: 8034 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/16/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2009 | | Treatment Summary: | FRAC CODL W/204,306 GAL SW & 150,220# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8014 ft. | # Of Holes: | 60 | | Interval Bottom: | 8034 ft. | Hole Size: | 0.04 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/15/2019 Interval Top: 7626 ft. Interval Bottom: 8034 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/16/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2010 | | Treatment Summary: | NBRR PERF 7626-7884 HOLES 60 SIZE 0.4. CODL PERF 8014-8034 HOLES 60 SIZE 0.42. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7996 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1305 | | CALC_MCF_GAS | 106 | | CASING_PRESS | 546 | | GRAVITY_OIL | 49 | | MCF_GAS | 106 | | TUBING_PRESS | 379 |
| | Perforation Data: | | Interval Top: | 7626 ft. | # Of Holes: | 120 | | Interval Bottom: | 8034 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/20/2010 Interval Top: 7626 ft. Interval Bottom: 7884 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/16/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/25/2009 | | Treatment Summary: | FRAC NBRR W/226,792 GAL SW & 200,940# 40/70 SAND & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7626 ft. | # Of Holes: | 60 | | Interval Bottom: | 7884 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/15/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|