|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/25/2024 Measured TD: 7870 ft. Vertical TD: 7634 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/25/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20082389 | Expiration Date: | 6/12/2009 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 68W | Footage: 1413 FSL 62 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 68W | Footage: 1413 FSL 62 FEL | | Proposed Depth/Form: | 7806 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/3/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7870 ft. | Measured PB depth: | 7774 ft. | | True Vertical TD: | 7634 ft. | True Vertical PB depth: | 7538 ft. | | Top PZ Location: | Sec:10 Twp: 2N 68W | Footage: 1413 FSL 62 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 68W | Footage: 1413 FSL 62 FEL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 817 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 817 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7803 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 579, Top: 2778 ft., Bottom: 7803 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7803 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 220 ft., Bottom: 2418 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3885 ft. | 4080 ft. | N | N | | SUSSEX | 4430 ft. | 4605 ft. | N | N | | SHANNON | 4908 ft. | 4955 ft. | N | N | | NIOBRARA | 7360 ft. | | N | N | | FORT HAYS | 7608 ft. | | N | N | | CODELL | 7628 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/15/2008 Interval Top: 7632 ft. Interval Bottom: 7648 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/4/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/30/2008 | | Treatment Summary: | 169,844 GALS FLUID & 115,860# 40/70 SAND & 4100# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7632 ft. | # Of Holes: | 64 | | Interval Bottom: | 7648 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/25/2024 Interval Top: 7360 ft. Interval Bottom: 7648 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/4/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1168 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 2944 | | CALC_MCF_GAS | 53 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 149 | | Interval Bottom: | 7648 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/15/2008 Interval Top: 7360 ft. Interval Bottom: 7512 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/4/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/30/2008 | | Treatment Summary: | 240,206 GALS FLUID & 201,260# 40/70 SAND & 4020# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 85 | | Interval Bottom: | 7512 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/25/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|