Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-24219
Well Classification: OW Status: PA - 7/23/2019
Well Name/No:HOPPER #24-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/23/2019
FacilityID:286526LocationID:336327
County:WELD #123Location:NESE 15 2N68W 6
Field:WATTENBERG - #90750Elevation:4900 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1973FSL  571 FELLat/Long: 40.136860 / -104.981780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.136928 / -104.981794Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/23/2019             Measured TD: 7750 ft.    Vertical TD: 7624 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/23/2019
Wellbore PermitDIRECTIONAL
Permit #:20063469 Expiration Date:8/30/2007
Proposed Top PZ Location:Sec:15 Twp: 2N 68W Footage: 2557 FNL  1174 FEL
Bottom Hole Location:Sec:15 Twp: 2N 68W Footage: 2557 FNL  1174 FEL
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:12/17/2006
Spud Date:12/11/2006Spud Date Is:ACTUAL
Measured TD:7750 ft.Measured PB depth:7739 ft.
True Vertical TD:7624 ft.True Vertical PB depth:7613 ft.
Top PZ Location:Sec:15 Twp: 2N 68WFootage: 2557 FNL  1174 FEL
Bottom Hole Location:Sec:15 Twp: 2N 68WFootage: 2560 FNL  1169 FEL
Log Types:CBL/CCL/GR, P/E AILC - CNLD - ML - CAL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 640 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 640 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7741 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 3330 ft., Bottom: 7741 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1531 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 254 ft., Bottom: 1567 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3900 ft.NN
SUSSEX4366 ft.NN
SHANNON4894 ft.NN
TEEPEE BUTTES6360 ft.NN
NIOBRARA7318 ft.NN
FORT HAYS7566 ft.NN
CODELL7587 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/9/2011                  Interval Top: 7588 ft.    Interval Bottom: 7612 ft.

 Completed Information for Formation CODELL
1st Production Date:3/19/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/4/2011
Treatment Summary:REMOVED CAST IRON BRIDGE PLUG TO COMMINGLE WITH NB.
Formation Treatment
Treatment Date:1/9/2007
Treatment Summary:160,440 GALS FLUID & 115,020 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 22
BTU_GAS 1406
CALC_BBLS_H2O 0
CALC_BBLS_OIL 22
CALC_GOR 5591
CALC_MCF_GAS 123
CASING_PRESS 450
GRAVITY_OIL 51
MCF_GAS 123
Perforation Data:
Interval Top:7588 ft.# Of Holes:72
Interval Bottom:7612 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/23/2019                 Interval Top: 7380 ft.    Interval Bottom: 7612 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/10/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2010
Treatment Summary:NB PERF 7380-7470 HOLES 68 SIZE .38 CD PERF 7588-7612 HOLES 72 SIZE .45
Tubing Size:2.375 in.Tubing Setting Depth:7567 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1273
CALC_BBLS_OIL 4
CALC_GOR 12750
CALC_MCF_GAS 51
CASING_PRESS 550
GRAVITY_OIL 49
MCF_GAS 51
TUBING_PRESS 500
Perforation Data:
Interval Top:7380 ft.# Of Holes:140
Interval Bottom:7612 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/19/2011                 Interval Top: 7380 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/10/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2010
Treatment Summary:Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 236,074 gal Silver Stim Hybrid w/ 200,560# 40/70 & 4,340# 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7380 ft.# Of Holes:68
Interval Bottom:7470 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/23/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No