|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/21/2025 Measured TD: 7845 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/21/2025 | | Wellbore Permit | | | Permit #: | 20060886 | Expiration Date: | 4/10/2007 | | Proposed Depth/Form: | 7840 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: E2NE4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: E2NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 4000 ft., Bottom: 5000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/25/2007 | | Spud Date: | 1/18/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7845 ft. | Measured PB depth: | 7778 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 516 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 516 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7824 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 5830 ft., Bottom: 7824 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5272 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 3420 ft., Bottom: 5272 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4370 ft. | | N | N | | SHANNON | 4820 ft. | | N | N | | NIOBRARA | 6888 ft. | | N | N | | CODELL | 7188 ft. | | N | N | | J SAND | 7657 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/21/2025 Interval Top: 7670 ft. Interval Bottom: 7735 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/14/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/11/2007 | | Treatment Summary: | FRAC'D THE J SAND WITH 250,220# 20/40, 12,000# 20/40 SUPER LC 4/11/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 100 | | Interval Bottom: | 7735 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/11/2025 Interval Top: 7190 ft. Interval Bottom: 7206 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/14/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7190 ft. | # Of Holes: | 64 | | Interval Bottom: | 7206 ft. | Hole Size: | |
|
Formation JDCNB Formation Classification: GW Status: CM - 8/3/2007 Interval Top: 6888 ft. Interval Bottom: 7700 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2007 | | Treatment Summary: | JSND/NBRR/CDL COMMINGLE. DRILLED UP CFP'S @ 7100' AND 7300' TO COMMINGLE THE JSND/NBRR/CDL 07/29/2007 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7650 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/3/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 85 | | BBLS_OIL | 27 | | BTU_GAS | 1169 | | CALC_BBLS_H2O | 85 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 2100 | | CALC_MCF_GAS | 567 | | GRAVITY_OIL | 61 | | MCF_GAS | 567 |
| | Perforation Data: | | Interval Top: | 6888 ft. | # Of Holes: | 232 | | Interval Bottom: | 7700 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/21/2025 Interval Top: 6888 ft. Interval Bottom: 7206 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/14/2007 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/11/2007 | | Treatment Summary: | NB-CD RECOMPLETION SET CFP@7300'. FRAC'D CODELL W/250,260# FRAC SAND, 12,000# 20/40 SUPER LC 4.12.07 SET CFP@7100'. FRAC'D NBRR W/251,040# FRAC SAND, 12,000 SUPER LC 4.12.07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6888 ft. | # Of Holes: | 132 | | Interval Bottom: | 7206 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/11/2025 Interval Top: 6888 ft. Interval Bottom: 7000 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/14/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6888 ft. | # Of Holes: | 68 | | Interval Bottom: | 7000 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/21/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 04/15/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|