|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/27/2018 Measured TD: 8100 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/27/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 20070896 | Expiration Date: | 3/27/2008 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 995 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 995 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8081 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 6690 ft., Bottom: 8081 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/4/2005 | | Spud Date: | 8/14/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8100 ft. | Measured PB depth: | 8064 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, CALIPER, SP, MICRO LOG, COMP. DENSITY/NEUTRON, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 995 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 995 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8081 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6646 ft., Bottom: 8081 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4694 ft. | | N | N | | NIOBRARA | 7216 ft. | | N | N | | FORT HAYS | 7456 ft. | | N | N | | CODELL | 7488 ft. | | N | N | | J SAND | 7958 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/27/2018 Interval Top: 7970 ft. Interval Bottom: 7994 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2005 | | Treatment Summary: | J-SAND UNDER CBP @7870. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 6480 | | CALC_MCF_GAS | 162 | | CASING_PRESS | 950 | | MCF_GAS | 162 | | TUBING_PRESS | 820 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 56 | | Interval Bottom: | 7994 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 9/10/2007 Interval Top: 7490 ft. Interval Bottom: 7500 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/29/2007 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/23/2007 | | Treatment Summary: | CODELL WAS FRAC'D WITH 128,352 GALS OF SILVERSTIM WITH 32# GEL LOADING AND 270,040#'S OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7490 ft. | # Of Holes: | 40 | | Interval Bottom: | 7500 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/27/2018 Interval Top: 7260 ft. Interval Bottom: 7500 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2005 | | Treatment Summary: | COMMINGLE CODELL AND NIOBRARA. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 27 | | BTU_GAS | 1420 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 4222 | | CALC_MCF_GAS | 114 | | CASING_PRESS | 825 | | GRAVITY_OIL | 56 | | MCF_GAS | 114 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 112 | | Interval Bottom: | 7500 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 9/10/2007 Interval Top: 7260 ft. Interval Bottom: 7278 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/29/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/23/2007 | | Treatment Summary: | NIOBRARA WAS FRAC'D WITH 70,056 GALS OF SLICKWATER, 99582 GALS OF SILVERSTIM WITH 28# GEL LOADING AND 249,880#'S OF 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 72 | | Interval Bottom: | 7278 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/27/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|