|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 11/11/2019 Measured TD: 8577 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 11/11/2019 | Wellbore Permit | DRIFTED | Permit #: | 20074384 | Expiration Date: | 9/9/2008 | Proposed Depth/Form: | 8577 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 922 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 0 ft., Bottom: 922 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8566 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 495, Top: 4972 ft., Bottom: 8566 ft. |
| | |
Wellbore Completed | Completion Date: | 11/26/2003 | Spud Date: | 11/15/2003 | Spud Date Is: | ACTUAL | Measured TD: | 8577 ft. | Measured PB depth: | 8540 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | GR, DIGL, CND, NEU, CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 922 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 0 ft., Bottom: 922 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8566 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 495, Top: 4972 ft., Bottom: 8566 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 2738 ft., Depth: 3204 ft., Bottom: 3235 ft., Sacks: 165, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 2922 ft., Depth: 3260 ft., Bottom: 3275 ft., Sacks: 25, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 1160 ft., Depth: 1529 ft., Bottom: 1700 ft., Sacks: 170, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4764 ft. | | N | N | NIOBRARA | 7576 ft. | | N | N | FORT HAYS | 7953 ft. | | N | N | CODELL | 7975 ft. | | N | N | J SAND | 8383 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 11/11/2019 Interval Top: 8370 ft. Interval Bottom: 8406 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/12/2004 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/16/2003 | Treatment Summary: | CIBP SET AT 8120'. J SAND SHUT-IN. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 0 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_GOR | 214000 | CALC_MCF_GAS | 214 | CASING_PRESS | 810 | MCF_GAS | 214 | TUBING_PRESS | 239 |
| Perforation Data: | Interval Top: | 8370 ft. | # Of Holes: | 72 | Interval Bottom: | 8406 ft. | Hole Size: | 0.38 in. |
|
Formation DKTA Formation Classification: GW Status: AB - 9/24/2002 Interval Top: 8136 ft. Interval Bottom: 8164 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/22/2002 | Treatment Summary: | FRAC 7/22/02 W/ 14,502 GAL SW & 54,020# 20/40 SAND & 4000# 100 MESH SAND. SET CIBP 9/24/02 @ 8086'. DKTA PERF'D & FRAC'D BUT NEVER PRODUCED, THEREFORE NO 1ST DATE OF PRODUCTION. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 8136 ft. | # Of Holes: | 84 | Interval Bottom: | 8164 ft. | Hole Size: | 0.23 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/10/2007 Interval Top: 7975 ft. Interval Bottom: 7995 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2007 | Treatment Summary: | FRAC CODELL W/115,000 LBS OF 30/50 SAND SUSPENDED IN SLICKWATER SOLUTIONS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7975 ft. | # Of Holes: | 60 | Interval Bottom: | 7995 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 11/11/2019 Interval Top: 7705 ft. Interval Bottom: 7995 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/25/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/16/2019 | Treatment End Date: | N/A | Treatment Summary: | RWTP UP TUBING AFTER NIOBRARA REFRAC ON 3/25/2008. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 12/16/2003 | Treatment Summary: | PRODUCING UP THE CASING. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1289 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 136 | CALC_GOR | 3176 | CALC_MCF_GAS | 432 | CASING_PRESS | 2425 | GRAVITY_OIL | 51 | TUBING_PRESS | 0 |
| Perforation Data: | Interval Top: | 7705 ft. | # Of Holes: | 180 | Interval Bottom: | 7995 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/10/2007 Interval Top: 7705 ft. Interval Bottom: 7845 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2007 | Treatment Summary: | FRAC NBRR "C" W/104,000 LBS 30/50 (4000# OF IT WAS 20/40 RESIN SAND) SUSPENDED IN A SLICKWATER SOLUTION. FRAC NBRR "B" W/100,000 LBS 30/50 SAND (4000# OF IT WAS 20/40 RESIN SAND) SUSPENDED IN A SLICKWATER SOLUTION. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7705 ft. | # Of Holes: | 120 | Interval Bottom: | 7845 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 10/31/2019 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|