Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-21795HULSTROM
6-22
KERR MCGEE OIL & GAS ONSHORE LP
47120
TA
11/11/2019
WATTENBERG
90750
WELD  123
SWNW 22 1N68W 6
332071View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
400684503
9/16/2014
1) The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. 2) Please submit gyro survey data with Form 5 Drilling Completion Report.
EngineerForm: (04 )
402369898
10/1/2020
This approval is good for one year and a new application must be made before April 14, 2021. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402369898
10/1/2020
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402678184
10/6/2021
1) This approval is good for one year and a new application must be made before 05/03/2022. Updates for the planned utilization of the well should be included with the application. 2) Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status. 3) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
EngineerForm: (04 )
403031853
4/29/2022
1) Effective April 30, 2022 this well will be designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be added to a Form 6A list no later than November 1, 2022.
 
COGIS - Best Management Practice Results
No records to display.