|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/30/2026 Measured TD: 7914 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/30/2026 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 7/18/2013 | | Proposed Depth/Form: | 7914 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: N/2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 833 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 833 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7909 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 330, Top: 6454 ft., Bottom: 7909 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4980 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 190, Top: 3849 ft., Bottom: 4980 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/5/2002 | | Spud Date: | 10/15/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7914 ft. | Measured PB depth: | 7894 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PECV, PEML, PEAILC, PECNLD, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 833 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 833 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7909 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 6460 ft., Bottom: 7909 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 3850 ft., Bottom: 4980 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4422 ft. | | N | N | | NIOBRARA | 6890 ft. | | N | N | | FORT HAYS | 7120 ft. | | N | N | | CODELL | 7142 ft. | | N | N | | D SAND | 7537 ft. | | N | N | | J SAND | 7596 ft. | | N | N | | DAKOTA | 7804 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 6/1/2005 Interval Top: 7810 ft. Interval Bottom: 7818 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2002 | | Treatment Summary: | EXISTING PLUG @ 7750'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 40000 | | CALC_MCF_GAS | 40 | | CASING_PRESS | 550 | | GRAVITY_OIL | 60 | | MCF_GAS | 40 | | TUBING_PRESS | 460 |
| | Perforation Data: | | Interval Top: | 7810 ft. | # Of Holes: | 32 | | Interval Bottom: | 7818 ft. | Hole Size: | 0.42 in. |
|
Formation JSND Formation Classification: OG Status: AB - 1/30/2026 Interval Top: 7602 ft. Interval Bottom: 7640 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/2/2003 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | REMOVED CAST IRON BRIDGE PLUG TO COMMINGLE WELL. COMMINGLED WITH NB-CD 1/5/2011. | | Formation Treatment | | Treatment Date: | 1/30/2009 | | Treatment Summary: | CIBP@ 7090'. 2 SX CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP & COMMINGLE WITHIN THE NEXT 6 MONTHS. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7586 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/2/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 1 | | BTU_GAS | 1297 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 36667 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 539 | | GRAVITY_OIL | 52 | | MCF_GAS | 6 | | TUBING_PRESS | 406 |
| | Perforation Data: | | Interval Top: | 7602 ft. | # Of Holes: | 52 | | Interval Bottom: | 7640 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OG Status: CM - 2/3/2011 Interval Top: 7144 ft. Interval Bottom: 7158 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/7/2003 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | REMOVED CAST IRON BRIDGE PLUG TO COMMINGLE WELL | | Formation Treatment | | Treatment Date: | 1/30/2009 | | Treatment Summary: | CIBP @ 7090'. TWO SACKS CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP & COMMINGLE WITHIN THE NEXT 6 MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7144 ft. | # Of Holes: | 28 | | Interval Bottom: | 7158 ft. | Hole Size: | 0.38 in. |
|
Formation JDCNB Formation Classification: GW Status: CM - 3/25/2005 Interval Top: 6900 ft. Interval Bottom: 7640 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | 0.000 in. | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7573 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 1340 | | CALC_MCF_GAS | 67 | | CASING_PRESS | 570 | | GRAVITY_OIL | 50 | | MCF_GAS | 67 | | TUBING_PRESS | 447 |
| | Perforation Data: | | Interval Top: | 6900 ft. | # Of Holes: | | | Interval Bottom: | 7640 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 1/30/2026 Interval Top: 6900 ft. Interval Bottom: 7158 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/5/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | CIBP REMOVED OVER CD SO THAT THE NB-CD COULD BE COMMINGLED. | | Formation Treatment | | Treatment Date: | 12/5/2002 | | Treatment Summary: | FRAC NB-CD W/116760# 20/40 MESH; 111434 GAL SAND LADEN FLUID. CODL PERFS 7144-7158; NBRR PERFS 6900-6924 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7856 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/2/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 21 | | BTU_GAS | 1297 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 36667 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 539 | | GRAVITY_OIL | 52 | | MCF_GAS | 6 | | TUBING_PRESS | 406 |
| | Perforation Data: | | Interval Top: | 6900 ft. | # Of Holes: | 112 | | Interval Bottom: | 7158 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OG Status: CM - 2/3/2011 Interval Top: 6900 ft. Interval Bottom: 7014 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/18/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | DRILLED OUT CAST IRON BRIDGE PLUG TO COMMINGLE WELL. | | Formation Treatment | | Treatment Date: | 2/6/2009 | | Treatment Summary: | NEW PERF INTERVALS: 6908'-6920', 6895'-6992', 7008'-7014'. 3 SPF. 252,464 GAL FLUID; 188,000# 30/50 SAND; 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1159 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 41 | | CASING_PRESS | 1006 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 646 |
| | Perforation Data: | | Interval Top: | 6900 ft. | # Of Holes: | 84 | | Interval Bottom: | 7014 ft. | Hole Size: | 0.42 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 6/23/2011| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2002 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DK-J. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/30/2026 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|