Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-21125HARKIS
1-15A
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
1/30/2026
WATTENBERG
90750
WELD  123
NENE 15 2N65W 6
331686
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 833 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404415619Form 1710/30/202510/30/2025 0NO FLOW NONE0 NO FLOW 595595No----PRE P/A- Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull3/19/20257/21/2025 0No FlowNone0No Flow593593NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/17/20247/9/2024 1WhisperNone--No Flow771770NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/17/20246/10/2024 1WhisperNone--No Flow771770NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/17/20246/10/2024 1WhisperNone--No Flow771770NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull3/9/20234/17/2023Plunger Lift0No FlowNone--No Flow577577NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull3/21/20224/18/2022Plunger Lift0No FlowNone--No Flow425425NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull4/12/20215/17/2021Plunger Lift1WhisperNone--No Flow575577NoNoNo Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull2/3/20206/8/2020 1Whisper (Very Low Flow) 0Down To Zero571571NoNoNoTubing shut in. Surface casing produced no liquid.
Click for SpecificsFull4/16/201912/10/2019 1Whisper (Very Low Flow) 0Down To Zero580578NoNoNoTubing shut in. Surface casing produced no liquid.
400729393Form 1710/6/201411/12/2014PLUNGER LIFT1GAS --0 DOWN TO 0 570570No----SURFACE CASING PRODUCED NO FLUIDS DURING TEST. SHUT THE SURFACE CASING IN FOR 15 MINUTES PRESSURE STAYED AT 0 PSI.