Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20665
Well Classification: GW Status: PA - 2/2/2017
Well Name/No:RADEMACHER #16-25A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/2/2017
FacilityID:261946LocationID:331420
Municipality/County:FIRESTONE / WELD #123Location:SESE 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4855 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  850 FELLat/Long: 40.191248 / -104.944818Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191250 / -104.944820Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/2/2017             Measured TD: 7814 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/2/2017
Wellbore PermitDRIFTED
Permit #: Expiration Date:12/3/2010
Proposed Depth/Form:7814 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: S2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 628 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 628 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7798 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7798 ft.

Wellbore Completed
Completion Date:1/16/2002
Spud Date:12/31/2001Spud Date Is:ACTUAL
Measured TD:7814 ft.Measured PB depth:7766 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PEAILC, PECNLD, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 628 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 628 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7798 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6754 ft., Bottom: 7798 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4018 ft.NN
SHANNON4610 ft.NN
NIOBRARA7054 ft.NN
FORT HAYS7186 ft.NN
CODELL7207 ft.NN
J SAND7647 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/23/2016                 Interval Top: 7658 ft.    Interval Bottom: 7686 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2010
Treatment Summary:CIBP set at 7553' with 10sx 20/40 sand on top; wireline tagged fill at 7514'
Formation Treatment
Treatment Date:1/16/2002
Treatment Summary:FRAC'D J SAND W/500240# 20/40 MESH; 210676 GALLONS GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 400000
CALC_MCF_GAS 800
CASING_PRESS 675
GRAVITY_OIL 60
MCF_GAS 800
TUBING_PRESS 500
Perforation Data:
Interval Top:7658 ft.# Of Holes:84
Interval Bottom:7686 ft.Hole Size:0.34 in.

Formation GRNHN                   Formation Classification:  GW                   Status:  AB - 2/23/2016                 Interval Top: 7424 ft.    Interval Bottom: 7456 ft.

 Completed Information for Formation GREENHORN
1st Production Date:N/AChoke Size: 
Formation Name:GREENHORNCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/6/2010
Treatment Summary:GH Perf: 7424-7456 Holes: 64 Size: .42 Frac GH w/ 1408 bbls SW and 2990 bbls of Dynaflow 2 with 45,200 lbs 100 mesh sand, 267,500# 20/40 sand and 8,000# 20/40 Super LC sand No choke
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1255
CALC_BBLS_OIL 4
CALC_MCF_GAS 4
CASING_PRESS 1311
GRAVITY_OIL 51
MCF_GAS 4
TUBING_PRESS 350
Perforation Data:
Interval Top:7424 ft.# Of Holes:64
Interval Bottom:7456 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/02/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No