|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2021 Measured TD: 8100 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2021 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/15/2002 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 80, Drill Unit: E2SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 315, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 3/7/2001 | | Spud Date: | 2/2/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8100 ft. | Measured PB depth: | 8083 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CONPENSATED DENSITY,COMPENSATED NEUTRON GR;DUAL INDUCTIN GUARD LOG GR; CBL GR VDL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 614 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 614 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8092 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 6620 ft., Bottom: 8092 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4106 ft., Depth: 4285 ft., Bottom: 4285 ft., Sacks: 100, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4385 ft. | | N | N | | SHANNON | 4915 ft. | | N | N | | NIOBRARA | 7231 ft. | | N | N | | FORT HAYS | 7472 ft. | | N | N | | CODELL | 7494 ft. | | N | N | | CARLILE | 7516 ft. | | N | N | | GREENHORN | 7540 ft. | | N | N | | GRANEROS | 7763 ft. | | N | N | | BENTONITE | 7763 ft. | | N | N | | MOWRY | 7914 ft. | | N | N | | J-2 SAND | 7928 ft. | | N | N | | SKULL CREEK | 8040 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 12/1/2021 Interval Top: 7932 ft. Interval Bottom: 7992 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/29/2009 | | Treatment Summary: | DRILLED OUT CBP @ 7850' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 106500 | | CALC_MCF_GAS | 426 | | CASING_PRESS | 420 | | MCF_GAS | 426 | | TUBING_PRESS | 230 |
| | Perforation Data: | | Interval Top: | 7932 ft. | # Of Holes: | 120 | | Interval Bottom: | 7992 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/3/2009 Interval Top: 7496 ft. Interval Bottom: 7516 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/7/2001 | | Treatment Summary: | SET BRIDGE PLUG @ 7570'. PERF CODELL. FRAC W/ 300,000 # 20/40 FRAC SAND IN 128,000 GALS PHOENIX 22# AND 20#. FLOW BACK FRAC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 35 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 3862 | | CALC_MCF_GAS | 134 | | CASING_PRESS | 180 | | MCF_GAS | 134 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 40 | | Interval Bottom: | 7516 ft. | Hole Size: | 0.4 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/3/2009 Interval Top: 7496 ft. Interval Bottom: 7992 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/7/2001 | | Treatment Summary: | DRILL OUT CIBP. RIH W/PROD TBG. SWAB WELL BACK. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7922 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/22/2002 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 18 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 35917 | | CALC_MCF_GAS | 647 | | CASING_PRESS | 460 | | MCF_GAS | 647 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 140 | | Interval Bottom: | 7992 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/3/2009 Interval Top: 7260 ft. Interval Bottom: 7992 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/7/2001 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7400'. 11/24/09. DRILLED OUT CBP @ 7850' TO COMMINGLE THE JSND-NBRR-CDL. 11/29/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7920 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 10 | | BTU_GAS | 1236 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 11400 | | CALC_MCF_GAS | 38 | | CASING_PRESS | 798 | | GRAVITY_OIL | 52 | | MCF_GAS | 38 | | TUBING_PRESS | 427 |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 260 | | Interval Bottom: | 7992 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2021 Interval Top: 7260 ft. Interval Bottom: 7516 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2009 | | Treatment Summary: | NBRR-CDL REFRAC SET CBP @ 7850'. 11-13-09. RE-FRAC'D THE CODELL WITH 251,060 20/40 SAND IN 81,396 GALS VISTAR 26/24 XLF. SAND PUMPED FROM 1# TO 5#. TOTAL GELLED FLUID. 115,542 GALS. TOTAL FRAC FLUID 119,490. 11/15/09. SET CFP @ 7400'. 11/17/09. RE-FRAC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 160 | | Interval Bottom: | 7516 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 11/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|