Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-19855
Well Classification: GW Status: PA - 5/2/2025
Well Name/No:MILLER #12-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/2/2025
FacilityID:256361LocationID:336467
Municipality/County:FREDERICK / WELD #123Location:SWNW 27 2N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2025FNL  600 FWLLat/Long: 40.111357 / -104.996716Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.111325 / -104.996672Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/2/2025             Measured TD: 8190 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/2/2025
Wellbore PermitDRIFTED
Permit #:20031304 Expiration Date:7/15/2004
Proposed Depth/Form:8190 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:4/11/2006
Spud Date:12/1/1999Spud Date Is:ACTUAL
Measured TD:8190 ft.Measured PB depth:8149 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON GR;DUAL INDUCTION GUARD LOG GR;CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 485 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 485 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8184 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6700 ft., Bottom: 8184 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5218 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4030 ft., Bottom: 5232 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4350 ft.NN
SHANNON4953 ft.NN
NIOBRARA7324 ft.NN
FORT HAYS7593 ft.NN
CODELL7615 ft.NN
CARLILE7638 ft.NN
GREENHORN7640 ft.NN
BENTONITE7872 ft.NN
GRANEROS7873 ft.NN
MOWRY8026 ft.NN
J SAND8042 ft.NN
SKULL CREEK8134 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  CM - 2/15/2002                 Interval Top: 8056 ft.    Interval Bottom: 8084 ft.

 Completed Information for Formation J SAND
1st Production Date:2/20/2000Choke Size:0.375 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:227,207 GALS FRAC GEL 27# HT, 25# W/ 547,800# 20-40 FRAC SAND. 1 PPG THRU 5 PPG
Tubing Size:2.375 in.Tubing Setting Depth:8044 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/20/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 2
CALC_BBLS_H2O 29
CALC_BBLS_OIL 2
CALC_GOR 180000
CALC_MCF_GAS 360
CASING_PRESS 350
MCF_GAS 360
TUBING_PRESS 210
Perforation Data:
Interval Top:8056 ft.# Of Holes:56
Interval Bottom:8084 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/15/2002                 Interval Top: 7616 ft.    Interval Bottom: 7632 ft.

 Completed Information for Formation CODELL
1st Production Date:4/12/2001Choke Size: 
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:300,000# 20/40 FRAC SAND IN 159,726 VISTAR 22# LHT & 20#. 1 PPG THRU 4 PPG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 21
CALC_BBLS_H2O 10
CALC_BBLS_OIL 21
CALC_GOR 2476
CALC_MCF_GAS 52
CASING_PRESS 160
MCF_GAS 52
Perforation Data:
Interval Top:7616 ft.# Of Holes:64
Interval Bottom:7632 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 2/15/2002                 Interval Top: 7616 ft.    Interval Bottom: 8084 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/15/2002Choke Size:0.343 in.
Formation Name:J-CODELLCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:DRILL OUT CIBP [IN JSND]. CLEAN HOLE. RUN PRODUCTION TBG
Tubing Size:2.375 in.Tubing Setting Depth:8142 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/15/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 15
CALC_BBLS_H2O 6
CALC_BBLS_OIL 15
CALC_GOR 25104
CALC_MCF_GAS 373
MCF_GAS 373
Perforation Data:
Interval Top:7616 ft.# Of Holes:120
Interval Bottom:8084 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/7/2009                 Interval Top: 7382 ft.    Interval Bottom: 8084 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:JSND-NBRR-CDL COMMINGLE, RELEASED RBP@ 7470' AND 7710' TO COMMINGLE THE JSND-NBRR-CDL. 9/24/09.
Tubing Size:2.375 in.Tubing Setting Depth:8044 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 14
BTU_GAS 1243
CALC_BBLS_H2O 1
CALC_BBLS_OIL 14
CALC_GOR 5000
CALC_MCF_GAS 70
CASING_PRESS 401
GRAVITY_OIL 51
MCF_GAS 70
TUBING_PRESS 297
Perforation Data:
Interval Top:7382 ft.# Of Holes:240
Interval Bottom:8084 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/2/2025                  Interval Top: 7382 ft.    Interval Bottom: 7632 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2009
Treatment Summary:NBRR-CDL RECOMPLETION, SET RBP@7710 8/30/09. SET RBP@7470. 9/03/09. RE-FRAC'D THE NIOBRARA WITH 149,100 GAL 26# VISTAR CROSS LINKED GEL HYBRID CONTAINING 252,129 20/40 SAND. 9/08/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7382 ft.# Of Holes:184
Interval Bottom:7632 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/5/2006                  Interval Top: 7382 ft.    Interval Bottom: 7412 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/5/2006Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/11/2006
Treatment Summary:166,782 GALS FRAC FLUID; 250,800# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7382 ft.# Of Holes:120
Interval Bottom:7412 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/02/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)48
Total Gas Produced (MCF)1398
GOR29125
GOR DeterminationMCFE
Average BOE per Day0.596
Average MCFE per Day3.457

 Federal Financial Assurance  i 

 Tribal Well  i No