|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/28/2022 Measured TD: 7881 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/28/2022 | | Wellbore Permit | | | Permit #: | 20084701 | Expiration Date: | 9/3/2009 | | Proposed Depth/Form: | 7881 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 870 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 605, Top: 0 ft., Bottom: 870 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7759 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 6250 ft., Bottom: 7759 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5006 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 3950 ft., Bottom: 5006 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/31/1998 | | Spud Date: | 3/13/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 7881 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DLL, GL, GR, CAL, CDL, CNL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 870 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 0 ft., Bottom: 870 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7759 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 6250 ft., Bottom: 7759 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7759 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 3950 ft., Bottom: 5002 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5005 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 3940 ft., Bottom: 5008 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: , Depth: 7881 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4454 ft. | | | | | NIOBRARA | 6852 ft. | | | | | FORT HAYS | 7124 ft. | | | | | CODELL | 7146 ft. | | | | | J SAND | 7596 ft. | | | | | DAKOTA | 7821 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 4/28/2022 Interval Top: 7759 ft. Interval Bottom: 7881 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/1998 | | Treatment Summary: | CIBP @ 7400'. TWO SACKS OF CEMENT PLACED ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE THE DAKOTA WITH THE NIOBRARA AND CODELL WITHIN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 312 | | CASING_PRESS | 650 | | GRAVITY_OIL | 48 | | MCF_GAS | 52 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7759 ft. | # Of Holes: | | | Interval Bottom: | 7881 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 4/28/2022 Interval Top: 7598 ft. Interval Bottom: 7646 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/1998 | | Treatment Summary: | CIBP@ 7400'. TWO SACKS OF CEMENT PLACED ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE THE J SAND WITH THE NIOBRARA AND CODELL WITHIN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | CALC_GOR | 585000 | | CALC_MCF_GAS | 597 | | CASING_PRESS | 300 | | GRAVITY_OIL | 48 | | MCF_GAS | 585 | | TUBING_PRESS | 120 |
| | Perforation Data: | | Interval Top: | 7598 ft. | # Of Holes: | 74 | | Interval Bottom: | 7646 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/27/1999 Interval Top: 7147 ft. Interval Bottom: 7167 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2008 | | Treatment Summary: | 169752 GAL FLUID, 115520 40/70 SAND, 4000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7147 ft. | # Of Holes: | 60 | | Interval Bottom: | 7167 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/28/2022 Interval Top: 6910 ft. Interval Bottom: 7167 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/11/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/31/1998 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/13/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1155 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 1693 | | CALC_MCF_GAS | 127 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 49 |
| | Perforation Data: | | Interval Top: | 6910 ft. | # Of Holes: | 168 | | Interval Bottom: | 7167 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/27/1999 Interval Top: 6910 ft. Interval Bottom: 7020 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2008 | | Treatment Summary: | PERFORATION INTERVAL: NIO. B 6910-6923, NIO. C 6994-7004, NIO. C 7010-7020. FRAC NIOBRARA C WITH 123769 GAL FLUI, 100480 40/70 SAND, 4000 20/40 SB EXCEL. FRAC NIOBRARA B WITH 242916 GAL FLUID, 20400 40/70 SAND, 4000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6910 ft. | # Of Holes: | 108 | | Interval Bottom: | 7020 ft. | Hole Size: | 0.38 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 10/12/2003| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA-JSND | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 3/31/1998 | | Treatment Summary: | COMMINGLED DAKOTA-J SAND. JSND PERFS: 7598-7646, DKTA PERFS: NONE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7716 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/12/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 97000 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 410 | | GRAVITY_OIL | 48 | | MCF_GAS | 97 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/28/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|