Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-18593
Well Classification: GW Status: PA - 12/13/2017
Well Name/No:VESSELS MINERALS E UNIT #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/13/2017
FacilityID:250790LocationID:335765
Municipality/County:ERIE / WELD #123Location:NESE 19 1N68W 6
Field:WATTENBERG - #90750Elevation:5040 ft.
Planned Location:1400FSL  1000 FELLat/Long: 40.033007 / -105.040577Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.033101 / -105.040709Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/13/2017             Measured TD: 8570 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/13/2017
Wellbore Permit
Permit #:19941385 Expiration Date:9/22/1995
Prop Depth/Form:8700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 0 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/15/1995
Spud Date:3/19/1995Spud Date Is:ACTUAL
Measured TD:8570 ft.Measured PB depth:8528 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, FDC, CNL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 858 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 858 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8602 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 7036 ft., Bottom: 8602 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5512 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 3970 ft., Bottom: 5512 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4482 ft.
SHANNON5154 ft.
NIOBRARA7389 ft.
CODELL7823 ft.
J SAND8269 ft.
DAKOTA8423 ft.
LAKOTA8487 ft.
MORRISON8530 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 12/13/2017                Interval Top: 8272 ft.    Interval Bottom: 8286 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/15/1995
Treatment Summary:FRAC W 565,000# 20/40 SAND IN 165,000 GAL FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 3
CALC_GOR 309000
CASING_PRESS 1050
MCF_GAS 927
TUBING_PRESS 940
Perforation Data:
Interval Top:8272 ft.# Of Holes:56
Interval Bottom:8286 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/15/2005                 Interval Top: 7823 ft.    Interval Bottom: 8286 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/1995
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation J-CDL.
Perforation Data:
Interval Top:7823 ft.# Of Holes:56
Interval Bottom:8286 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/23/2003                 Interval Top: 7420 ft.    Interval Bottom: 7736 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/1995
Treatment Summary:SET CIBP @ 7800'. PERF'D THE NIOBRARA FROM 7420 - 7450', 7706 - 7736' W/ 2 SPF. FRAC'D W/ 88,323# 20/40 SAND. FLOW BACK WELL. RIH W/TBG. LAND TBG. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:7412 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 6
CALC_BBLS_H2O 9
CALC_BBLS_OIL 6
CALC_GOR 12000
CALC_MCF_GAS 72
CASING_PRESS 600
MCF_GAS 72
TUBING_PRESS 340
Perforation Data:
Interval Top:7420 ft.# Of Holes:120
Interval Bottom:7736 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/9/2003                 Interval Top: 7404 ft.    Interval Bottom: 8286 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/15/1995Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/1995
Treatment Summary:RIH W/TBG. DRILL OUT CIBP @ 7800'. POOH. RIH W/NC/SN, JTS, TBG. LAND EOT @ 8264'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8264 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 10
CALC_BBLS_H2O 13
CALC_BBLS_OIL 10
CALC_GOR 20800
CALC_MCF_GAS 208
CASING_PRESS 200
MCF_GAS 208
TUBING_PRESS 100
Perforation Data:
Interval Top:7404 ft.# Of Holes:71
Interval Bottom:8286 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/13/2017                Interval Top: 7404 ft.    Interval Bottom: 7839 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/15/1995
Treatment Summary:ACIDIZE Q/ 24 BBL 10% HCL, FRAC W/ 450,000# 20/40 M IN 132,972 GAL FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 17
CALC_GOR 4411
CASING_PRESS 160
MCF_GAS 75
Perforation Data:
Interval Top:7404 ft.# Of Holes:15
Interval Bottom:7839 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No