Engineer | Form: (06 ) 401357700 9/17/2017 | This well is indicated to have a bridge plug previously set - that BP and its cementing shold be reported on a Completed Interval Report, Form 5A. Montly Report of Operations, Form 7 reporting should correctly report this well as temporarily abandoned starting when the well became incapable of production. |
Engineer | Form: (06 ) 401357700 9/17/2017 | Bradenhead test previously performed, if well plugged prior to February 16, 2018, a new Bradenhead test is not necessary. |
Engineer | Form: (06 ) 401357700 9/17/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|