Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-16462
Well Classification: GW Status: PA - 9/3/2019
Well Name/No:SWINK 1 #3-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/3/2019
FacilityID:248661LocationID:328808
County:WELD #123Location:SESE 21 1N68W 6
Field:WATTENBERG - #90750Elevation:5204 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FELLat/Long: 40.032078 / -105.002576Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.032129 / -105.002695Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/3/2019             Measured TD: 8758 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/3/2019
Wellbore Permit
Permit #:20020966 Expiration Date:5/21/2003
Proposed Depth/Form:8704 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 0 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:4/1/1993
Spud Date:2/12/1993Spud Date Is:ACTUAL
Measured TD:8758 ft.Measured PB depth:8724 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL/SFL/SP/CAL, CNL/LDT/GR, GR/CBL/CCL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 911 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 0 ft., Bottom: 911 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 4310 ft., Bottom: 8750 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4894 ft.
NIOBRARA7574 ft.
CODELL7974 ft.
J SAND8421 ft.
DAKOTA8577 ft.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 12/8/2015                 Interval Top: 8588 ft.    Interval Bottom: 8660 ft.

 Completed Information for Formation DAKOTA
1st Production Date:6/6/1993Choke Size: 
Formation Name:DAKOTACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/27/1993
Treatment Summary:Set CIBP @ 8569' with 2 sacks cement over Dakota Perfs. Set CIBP @ 8320', plug failed, set CIBP @ 8150'. Reperf & refrac CODL. Cleaned out to 80' below CODL, ran tbg to 8454', CIBP had fallen down hole.
Formation Treatment
Treatment Date:4/1/1993
Treatment Summary:FRAC: 56,000 GAL & 150,000#
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_MCF_GAS 16
CASING_PRESS 880
MCF_GAS 16
Perforation Data:
Interval Top:8588 ft.# Of Holes:112
Interval Bottom:8660 ft.Hole Size:0.38 in.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/3/2019                  Interval Top: 8423 ft.    Interval Bottom: 8443 ft.

 Completed Information for Formation J SAND
1st Production Date:6/6/1993Choke Size:0.313 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/1993
Treatment Summary:FRAC W/133,700 GAL APOLLO 40 AND 450,000#20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:8378 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/1993Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 1
BTU_GAS 1189
CALC_BBLS_H2O 23
CALC_BBLS_OIL 1
CALC_MCF_GAS 360
CASING_PRESS 500
MCF_GAS 360
TUBING_PRESS 240
Perforation Data:
Interval Top:8423 ft.# Of Holes:41
Interval Bottom:8443 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 9/3/2019                  Interval Top: 7976 ft.    Interval Bottom: 7994 ft.

 Completed Information for Formation CODELL
1st Production Date:6/6/1993Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/1993
Treatment Summary:REFRAC CODELL W/29,342 GAL FR WTR, 80,880 GAL OF SILVERSTIM & 225,100# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7970 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 20
BTU_GAS 1220
CALC_GOR 8750
CASING_PRESS 620
MCF_GAS 175
TUBING_PRESS 480
Perforation Data:
Interval Top:7976 ft.# Of Holes:72
Interval Bottom:7994 ft.Hole Size:0.4 in.

Formation DKJCD                   Formation Classification:  GW                   Status:  CM - 9/3/2019                  Interval Top: 7976 ft.    Interval Bottom: 8660 ft.

 Completed Information for Formation DAKOTA-J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTA-J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/1993
Treatment Summary:FRAC W/126,000 GAL OF 27# OPTIFRAC LITE GEL AND 234,460# OF 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKJCD.
Perforation Data:
Interval Top:7976 ft.# Of Holes:217
Interval Bottom:8660 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/3/2019

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/1/1993
Treatment Summary:40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2005Test Method:PLUNGER LIFT
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 5
CASING_PRESS 400
MCF_GAS 60
TUBING_PRESS 250
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/03/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No