|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/7/2017 Measured TD: 8034 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/7/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 20055110 | Expiration Date: | 2/1/2007 | | Proposed Depth/Form: | 7285 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NW | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499/232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-125 , Unit Acreage: 80, Drill Unit: S2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1001 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1001 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 8036 ft., Weight: 12.95 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 6160 ft., Bottom: 8036 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/5/1993 | | Spud Date: | 12/8/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8034 ft. | Measured PB depth: | 7988 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | COMP DENSITY, DIL, CBL-CCL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1001 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1001 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 8036 ft., Weight: 9.3 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 6160 ft., Bottom: 8036 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4374 ft. | | N | N | | NIOBRARA | 6960 ft. | | N | N | | CODELL | 7275 ft. | | N | N | | J SAND | 7688 ft. | | N | N | | DAKOTA | 7885 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 12/7/2017 Interval Top: 7888 ft. Interval Bottom: 7916 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/5/1993 | | Treatment Summary: | DAKOTA UNDER SAND PLUG @ 7735 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10.5 | | CALC_GOR | 23333 | | MCF_GAS | 245 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7888 ft. | # Of Holes: | 57 | | Interval Bottom: | 7916 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 12/7/2017 Interval Top: 7692 ft. Interval Bottom: 7726 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/9/1999 | Choke Size: | 0.375 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/5/1993 | | Treatment Summary: | 165,048 GALS SATURN 1 W/30#, 28# & 25# GEL LOADINGS & 450,360# 20/40 OTTAWA SAND. |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7663 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/9/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 3 | | CALC_GOR | 16000 | | CASING_PRESS | 480 | | MCF_GAS | 372 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 7692 ft. | # Of Holes: | 58 | | Interval Bottom: | 7726 ft. | Hole Size: | 0.34 in. |
|
Formation CODL Formation Classification: GW Status: AB - 12/7/2017 Interval Top: 7277 ft. Interval Bottom: 7288 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2006 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/17/2006 | | Treatment Summary: | CODELL FRAC'D W/124,530 GALS OF VISTAR W/22 LB GEL & 270,680 LSS OF 20/40 OTTAWA SAND. |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7253 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/11/2006 | Test Method: | | | Hours Tested: | 3 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 15 | | CALC_GOR | 4067 | | MCF_GAS | 61 |
| | Perforation Data: | | Interval Top: | 7277 ft. | # Of Holes: | 44 | | Interval Bottom: | 7288 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/19/2008 Interval Top: 7277 ft. Interval Bottom: 7726 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/5/1993 | | Treatment Summary: | COMMINGLE CODL & JSND |
| | Tubing Size: | 2.166667 in. | Tubing Setting Depth: | 7675 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/19/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 10 | | BTU_GAS | 1100 | | CALC_GOR | 18900 | | CASING_PRESS | 400 | | GRAVITY_OIL | 57 | | MCF_GAS | 189 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 7277 ft. | # Of Holes: | 102 | | Interval Bottom: | 7726 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/07/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|