Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14575
Well Classification: GW Status: SI - 7/1/2020
Well Name/No:SARCHET UPRR #42-23 3X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2020
FacilityID:246778LocationID:336298
County:WELD #123Location:SENE 23 3N66W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Planned Location:1966FNL  576 FELLat/Long: 40.212437 / -104.737029Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.212490 / -104.736900Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2022             Measured TD: 7541 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2022
Wellbore PermitDIRECTIONAL
Permit #:19960726 Expiration Date:7/20/1990
Proposed Depth/Form:7565 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit:

Wellbore Completed
Completion Date:5/16/1990
Spud Date:4/24/1990Spud Date Is:ACTUAL
Measured TD:7541 ft.Measured PB depth:7502 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1739 FNL  774 FEL
Bottom Hole Location:Sec: Twp: Footage: 1288 N  1102 E
Log Types:DIGL, DSN-CDL, GAMMA RAY, BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 670 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 6600 ft., Bottom: 6750 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.75 in., Size: 2.375 in., Top: 6659 ft., Depth: 7973 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 7020 ft., Bottom: 7973 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4604 ft.NN
NIOBRARA7142 ft.NN
FORT HAYS7380 ft.NN
CODELL7402 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/15/2002                 Interval Top: 7404 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation CODELL
1st Production Date:5/23/1990Choke Size:0.125 in.
Formation Name:CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/1990
Treatment Summary:7404-7414' 24M# 100 MESH, 430M# 20/40 IN 2094 BBLS 40# GEL. ATP 3400# @ 18 BPM. ISDP 4260#. 5 MIN 4180#, 10 MIN 4180#, 15 MIN 4180#.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/1990Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 49
CALC_BBLS_H2O 0
CALC_BBLS_OIL 49
CALC_GOR 10286
CALC_MCF_GAS 504
CASING_PRESS 2000
MCF_GAS 504
Perforation Data:
Interval Top:7404 ft.# Of Holes:20
Interval Bottom:7414 ft.Hole Size:0.375 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  CM - 7/15/2002                 Interval Top: 7148 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.218 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/1990
Treatment Summary:SEE CODL. NBRR: 750 GAL 10% HCL & 77,940 GAL PUREGEL III W/5,000# 100 MESH & 196,000# 20/40 SAND. ISDP 4030#. // REFRAC NB-CD 6/4/02 W/261,380 #20/40 MESH & 90,469 GAL. GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:6627 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2002Test Method:PLUNGER
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 6
CALC_BBLS_OIL 6
CALC_GOR 13667
CALC_MCF_GAS 82
CASING_PRESS 510
GRAVITY_OIL 60
MCF_GAS 82
TUBING_PRESS 250
Perforation Data:
Interval Top:7148 ft.# Of Holes:39
Interval Bottom:7414 ft.Hole Size:0.375 in.

Sidetrack #01             Wellbore Classification:              Status: SI - 7/1/2020             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         SI - 7/1/2020
Wellbore Permit
Permit #:19960726 Expiration Date:10/16/1997
Proposed Depth/Form:7930 ft.
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:N/A
Spud Date:4/24/1990Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 7/1/2020

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/1/2001Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/1/2001
Treatment Summary:ALL INFORMATION UNDER SIDETRACK #00
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2020
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No