|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/21/2016 Measured TD: 7985 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/21/2016 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 12/14/2013 | | Proposed Depth/Form: | 7985 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 667 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7980 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 6024 ft., Bottom: 7980 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/4/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 7985 ft. | Measured PB depth: | 7891 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-SP-GR-CNL-LDT-NGT-ML-CAL | | Log Types: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 667 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7980 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 6240 ft., Bottom: 7980 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7980 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 4676 ft., Bottom: 5399 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 7980 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 4370 ft., Bottom: 4638 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 7980 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 130, Top: 710 ft., Bottom: 1235 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4662 ft., Depth: 5375 ft., Bottom: 5397 ft., Sacks: 270, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4370 ft., Depth: 4611 ft., Bottom: 4639 ft., Sacks: 120, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 715 ft., Depth: 1217 ft., Bottom: 1235 ft., Sacks: 130, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 5123 ft., Depth: 5405 ft., Bottom: 5397 ft., Sacks: 35, Method: | | Additional Cement: | String Type: 1ST , Top: 4510 ft., Depth: 4640 ft., Bottom: 4640 ft., Sacks: 15, Method: | | Additional Cement: | String Type: 1ST , Top: 1096 ft., Depth: 1230 ft., Bottom: 1230 ft., Sacks: 15, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4660 ft. | | N | N | | SHANNON | 5440 ft. | | N | N | | NIOBRARA | 7034 ft. | | N | N | | CODELL | 7320 ft. | | N | N | | BENTONITE | 7579 ft. | | N | N | | J SAND | 7754 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/21/2016 Interval Top: 7766 ft. Interval Bottom: 7810 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/17/1990 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/29/2012 | | Treatment Summary: | SET CIBP @ 7490' W/ 2 SKS SAND ON PLUG FOR NB/CD RECOMPLETE. | | Formation Treatment | | Treatment Date: | 11/8/1990 | | Treatment Summary: | 189,000 GAL 35# GEL AND 955,000# 20-40 SAND, FLUSH WITH 7390 GAL QIR 40 BMP. ATP 1600 PSI |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 115000 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 600 | | MCF_GAS | 230 | | TUBING_PRESS | 430 |
| | Perforation Data: | | Interval Top: | 7766 ft. | # Of Holes: | 176 | | Interval Bottom: | 7810 ft. | Hole Size: | 0.5 in. |
|
Formation CODL Formation Classification: GW Status: CM - 9/13/2012 Interval Top: 7324 ft. Interval Bottom: 7344 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/11/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/14/2012 | | Treatment Summary: | CD PERF 7324-7344 HOLES 60 SIZE 0.38
Frac CODL down 3.5" tbg w/ pkr ^ ni w/ 202,482 gal slickwater w/ 150,960# 40/70, 4,000# SB Excel.
Broke @ 2,505 psi @ 3.1 bpm. ATP=6,052 psi; MTP=6,973 psi; ATR=41.0 bpm; ISDP=2,927 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7324 ft. | # Of Holes: | 60 | | Interval Bottom: | 7344 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/21/2016 Interval Top: 7092 ft. Interval Bottom: 7344 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/11/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/14/2012 | | Treatment Summary: | NB PERF 7092-7202 HOLES 66 SIZE 0.42
CD PERF 7324-7344 HOLES 60 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 30 | | BTU_GAS | 1289 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 400 | | GRAVITY_OIL | 49 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7092 ft. | # Of Holes: | 126 | | Interval Bottom: | 7344 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/13/2012 Interval Top: 7092 ft. Interval Bottom: 7202 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/11/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/14/2012 | | Treatment Summary: | NB PERF 7092-7202 HOLES 66 SIZE 0.42
Frac NBRR down 3.5" tbg w/ pkr ^ ni w/ 237,720 gal slickwater w/ 201,100# 40/70, 4,000# SB Excel.
Broke @ 3,098 psi @ 1 bpm. ATP=6,022 psi; MTP=6,855 psi; ATR=40.1 bpm; ISDP=3,364 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7092 ft. | # Of Holes: | 66 | | Interval Bottom: | 7202 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/21/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|