|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/11/2018 Measured TD: 7550 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/11/2018 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 8/3/2012 | Proposed Depth/Form: | 8004 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: S2SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: S2S2SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 649 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 325, Top: 10 ft., Bottom: 649 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7543 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 180, Top: 6510 ft., Bottom: 7543 ft. | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8004 ft., Weight: 6.5 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 7468 ft., Bottom: 8004 ft. |
| | |
Wellbore Completed | Completion Date: | 12/19/1989 | Spud Date: | 7/29/1989 | Spud Date Is: | ACTUAL | Measured TD: | 7550 ft. | Measured PB depth: | 7503 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIGITAL SONIC LOG, BOND LOG, DIFL/GR, CNL/GR | Log Types: | CBL DEN - NEUT IND | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 649 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 0 ft., Bottom: 649 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7543 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 180, Top: 6500 ft., Bottom: 7543 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8004 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 30, Top: 7468 ft., Bottom: 8004 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7136 ft. | | N | N | FORT HAYS | 7386 ft. | | N | N | CODELL | 7408 ft. | | N | N | GREENHORN | 7492 ft. | | N | N | J SAND | 7846 ft. | | N | N |
Formation JSND Formation Classification: OG Status: AB - 9/11/2018 Interval Top: 7848 ft. Interval Bottom: 7900 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/11/1998 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/8/2013 | Treatment End Date: | N/A | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 9/8/2010 | Treatment Summary: | Set sand plug @ 7473'. | Formation Treatment | Treatment Date: | 12/19/1989 | Treatment Summary: | 560,940# 20-40 MESH; 287,994 GALS GELLED FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7848 ft. | # Of Holes: | 72 | Interval Bottom: | 7900 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 10/25/2010 Interval Top: 7412 ft. Interval Bottom: 7426 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/13/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/2010 | Treatment Summary: | Reperf CODL 7412-7426 Holes 28 Size 0.38.
Tri-frac CODL w/ 134,055 gal pHaser & 220,680# 30/50 sand & 4,000# SB Excel. | Formation Treatment | Treatment Date: | 12/19/1989 | Treatment Summary: | ORIGINAL COMPLETION: FRA'C DW/ 24,000# 100 MESH, 300,000# 20-40 MESH, 76,550 GALS GELLED FLUID. 11/98: CM'D W/ JSND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 35 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 35 | CALC_GOR | 2886 | CALC_MCF_GAS | 101 | CASING_PRESS | 1650 | GRAVITY_OIL | 60 | MCF_GAS | 101 | TUBING_PRESS | 850 |
| Perforation Data: | Interval Top: | 7412 ft. | # Of Holes: | 75 | Interval Bottom: | 7426 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 11/25/1998 Interval Top: 7412 ft. Interval Bottom: 7900 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 11/25/1998 | Choke Size: | 0.281 in. | Formation Name: | J-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7427 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/25/1998 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 10 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 10 | CALC_GOR | 56600 | CALC_MCF_GAS | 566 | CASING_PRESS | 570 | GRAVITY_OIL | 60 | MCF_GAS | 566 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7412 ft. | # Of Holes: | | Interval Bottom: | 7900 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OG Status: CM - 2/12/2013 Interval Top: 7141 ft. Interval Bottom: 7900 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/11/2013 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/12/2013 | Treatment End Date: | N/A | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7534 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/12/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1274 | CALC_BBLS_OIL | 1 | CALC_GOR | 23000 | CALC_MCF_GAS | 23 | CASING_PRESS | 704 | GRAVITY_OIL | 49 | MCF_GAS | 23 | TUBING_PRESS | 667 |
| Perforation Data: | Interval Top: | 7141 ft. | # Of Holes: | 168 | Interval Bottom: | 7900 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/11/2018 Interval Top: 7141 ft. Interval Bottom: 7426 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/13/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/2010 | Treatment Summary: | NBRR Perf 7141-7290 Holes 68 Size 0.38 CODL Perf 7412-7426 Holes 75 Size 0.38
Frac NBRR w/ 171,034 gal pHaser Hybrid & 250,840# 20/40 sand & 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/16/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 63 | BTU_GAS | 1219 | CALC_BBLS_OIL | 63 | CALC_GOR | 3810 | CALC_MCF_GAS | 240 | CASING_PRESS | 852 | GRAVITY_OIL | 51 | MCF_GAS | 240 |
| Perforation Data: | Interval Top: | 7141 ft. | # Of Holes: | 143 | Interval Bottom: | 7426 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 09/11/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|