|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/1/2020 Measured TD: 7296 ft. Vertical TD: 7296 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/1/2020 | Wellbore Permit | DRIFTED | Permit #: | 881139 | Expiration Date: | 3/16/1989 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 40, Drill Unit: NENW |
| | |
Wellbore Completed | Completion Date: | 1/1/1989 | Spud Date: | 11/18/1988 | Spud Date Is: | ACTUAL | Measured TD: | 7296 ft. | Measured PB depth: | 7214 ft. | True Vertical TD: | 7296 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 303 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 303 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 7290 ft., Weight: 10.3 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6100 ft., Bottom: 7290 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6780 ft. | | | | CODELL | 7098 ft. | | | |
Formation CODL Formation Classification: GW Status: AB - 4/1/2020 Interval Top: 7099 ft. Interval Bottom: 7122 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/13/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7099 ft. | # Of Holes: | | Interval Bottom: | 7122 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: CM - 11/18/2008 Interval Top: 6796 ft. Interval Bottom: 7122 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6796 ft. | # Of Holes: | | Interval Bottom: | 7122 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: AB - 4/1/2020 Interval Top: 6796 ft. Interval Bottom: 6997 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/13/2008 | Choke Size: | 1.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/13/2008 | Treatment Summary: | FRAC'D W/ 4,109 BBLS & 238,400# OTTAWA 30/50 & 12,000# SB EXCEL 12/20 SAND. |
| Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 6777 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/18/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 6 | BTU_GAS | 1250 | CALC_GOR | 35500 | CASING_PRESS | 280 | GRAVITY_OIL | 55 | MCF_GAS | 213 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 6796 ft. | # Of Holes: | 330 | Interval Bottom: | 6997 ft. | Hole Size: | 0.27 in. |
|
|
|
|
|
Reported Plugged | Y | 04/01/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|