Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-12821
Well Classification: GW Status: PA - 4/13/2023
Well Name/No:ARISTOCRAT #24-3C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/13/2023
FacilityID:245026LocationID:332921
County:WELD #123Location:SESW 3 3N65W 6
Field:ARISTOCRAT - #2925Elevation:4793 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:800FSL  1880 FWLLat/Long: 40.249297 / -104.651997Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.249475 / -104.652281Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/13/2023             Measured TD: 7276 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/13/2023
Wellbore PermitDRIFTED
Permit #:19851635 Expiration Date:3/15/1986
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SW

Wellbore Completed
Completion Date:12/17/1986
Spud Date:11/14/1985Spud Date Is:ACTUAL
Measured TD:7276 ft.Measured PB depth:7210 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND, COMP DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 424 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 424 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7272 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1225, Top: 2920 ft., Bottom: 7272 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4411 ft.NN
NIOBRARA6809 ft.NN
CODELL7112 ft.NN

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/20/2004                 Interval Top: 6850 ft.    Interval Bottom: 7040 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/8/1986Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:12/17/1986
Treatment Summary:SEE SCANNED DOCS 00627604; 01337821 & 01173844
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 5
CALC_BBLS_H2O 5
CALC_BBLS_OIL 5
CALC_GOR 36600
CALC_MCF_GAS 183
CASING_PRESS 380
MCF_GAS 183
Perforation Data:
Interval Top:6850 ft.# Of Holes:60
Interval Bottom:7040 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/13/2023                 Interval Top: 6835 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2009
Treatment Summary:NB-CD COMMINGLE. RELEASED RBP @ 7080' TO COMMINGLE THE NBRR & CODL. 7/15/09
Tubing Size:2.375 in.Tubing Setting Depth:7095 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 17
BTU_GAS 1290
CALC_BBLS_H2O 10
CALC_BBLS_OIL 17
CALC_GOR 22647
CALC_MCF_GAS 385
CASING_PRESS 454
GRAVITY_OIL 59
MCF_GAS 385
TUBING_PRESS 192
Perforation Data:
Interval Top:6835 ft.# Of Holes:174
Interval Bottom:7124 ft.Hole Size:0.41 in.

Formation NBCSX                   Formation Classification:  GW                   Status:  CM - 3/3/2002                  Interval Top: 4415 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation NIOBRARA-CODELL-SUSSEX
1st Production Date:12/17/1986Choke Size: 
Formation Name:NIOBRARA-CODELL-SUSSEXCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/1986Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 5
CALC_BBLS_OIL 11
CALC_MCF_GAS 196
TUBING_PRESS 500
Perforation Data:
Interval Top:4415 ft.# Of Holes:
Interval Bottom:7124 ft.Hole Size:

Formation SUSX                     Formation Classification:  OW                     Status:  AB - 9/16/2008                 Interval Top: 4415 ft.    Interval Bottom: 4480 ft.

 Completed Information for Formation SUSSEX
1st Production Date:7/22/1986Choke Size:0.250 in.
Formation Name:SUSSEXCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/17/1986
Treatment Summary:SEE SCANED DOCS 00627606 & 01337821
Tubing Size:2.375 in.Tubing Setting Depth:4290 ft.
Tubing Packer Depth:4590 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/1986Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 60
CALC_BBLS_OIL 93
CALC_GOR 1677
CALC_MCF_GAS 156
CASING_PRESS 600
TUBING_PRESS 200
Perforation Data:
Interval Top:4415 ft.# Of Holes:135
Interval Bottom:4480 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/13/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No