|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2020 Measured TD: 8130 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/4/2011 | | Proposed Depth/Form: | 8130 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 810 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 15 ft., Bottom: 810 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8130 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 930, Top: 4480 ft., Bottom: 8130 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/7/1983 | | Spud Date: | 1/21/1983 | Spud Date Is: | ACTUAL | | Measured TD: | 8130 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 810 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8130 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 930, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4482 ft. | | N | N | | SHANNON | 4762 ft. | | N | N | | NIOBRARA | 7255 ft. | | N | N | | CODELL | 7482 ft. | | N | N | | BENTONITE | 7767 ft. | | N | N | | J SAND | 7950 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 10/1/2019 Interval Top: 7948 ft. Interval Bottom: 8004 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/18/1983 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2011 | | Treatment Summary: | DRILLED OUT CIBP SET @ 7580' TO COMMINGLE WITH NB/CD. HOLE SIZE N/A | | Formation Treatment | | Treatment Date: | 5/18/2010 | | Treatment Summary: | SET CIBP @ 7580 W/ 2 SACKS OF CEMENT FOR MECHAICAL INTEGRITY. | | Formation Treatment | | Treatment Date: | 11/7/1983 | | Treatment Summary: | 7948-8004' : 817 BC X 4856 BW X 832,000# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 40000 | | GRAVITY_OIL | 58.7 |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | 224 | | Interval Bottom: | 8004 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/26/2011 Interval Top: 7296 ft. Interval Bottom: 8004 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2011 | | Treatment Summary: | DRILLED OUT CIBP SET @ 7580' TO COMMINGLE JSND WITH NB/CD. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7903 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1266 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 12000 | | CALC_MCF_GAS | 48 | | CASING_PRESS | 470 | | GRAVITY_OIL | 57 | | MCF_GAS | 48 | | TUBING_PRESS | 443 |
| | Perforation Data: | | Interval Top: | 7296 ft. | # Of Holes: | 314 | | Interval Bottom: | 8004 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 8/1/2020 Interval Top: 7296 ft. Interval Bottom: 7498 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/7/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/24/2010 | | Treatment Summary: | NBRR PERF 7296-7498 HOLES 48 SIZE 0.42. CODL PERF 7484-7498 HOLES 42 SIZE 0.38. FRAC NBRR W/ 504 GAL 15% HCL AND 170562 GAL VISTAR AND 251000# 20/40 SAND AND 4260# SB EXCEL. FRAC CD W/ 117432 GAL VISTAR AND 261520# 20/40 SAND AND 4340# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/15/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1175 | | CALC_BBLS_OIL | 99 | | CALC_GOR | 4848 | | CALC_MCF_GAS | 480 | | CASING_PRESS | 297 | | GRAVITY_OIL | 54 |
| | Perforation Data: | | Interval Top: | 7296 ft. | # Of Holes: | 90 | | Interval Bottom: | 7498 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|