| Agency | Form: (02) 2585507 02/04/2010 | 1) Provide cement bond log to verify isolation of Shannon and Sussex 2) If this work has not been performed, then provide remedial cement coverage from 200’ below Shannon to 200’ above Sussex (minimum coverage 5200’ to 4360’). Verify remedial coverage with cement bond log. |